Similar Projects
USP Canaan - Replace Powerhouse Boiler #1
Design
$250,000 to $500,000 est. value
Waymart, PA 18472

Well Pump/Piping Install and Treatment System Upgrade - General
Bidding
$180,000 est. value
Woodward, PA 16882

Tasker Morris Station ADA Upgrades- MC
Term Contract
Bidding
Philadelphia, PA 19145

WWTP Grey Water Pumps
Post-Bid
Less than $72,000 est. value
Pittsburgh, PA 15222

Kelly Township Building Addition - Mechanical Construction
Post-Bid
Lewisburg, PA 17837

CCM Coordinate Measuring Machine & Install
Results
Tobyhanna, PA 18466

Glannons Pump Station and Force Main Upgrade - General/Mechanical Construction
Results
Allison Park, PA 15101

Sand Spring Wastewater Treatment Plant Upgrades- General/Process Mechanical
Construction
Less than $3,000,000 est. value
Schnecksville, PA 18078

HVAC Equipment Replacement - Contract No. 2: Mechanical Construction
Alteration
Bidding
$2,000,000 est. value
Pittston, PA 18643

Aliquippa BF Jones Library Boiler
Post-Bid
Aliquippa, PA 15001

Annual Boiler/Burner Maintenance and Tuning
Term Contract
Results
Quakertown, PA 18951

Suburban Station Platform Ventilation Modifications - Mechanical Construction
Alteration
Bidding
Philadelphia, PA 19102

Water Treatment Improvements - General/Mechanical Construction
Post-Bid
Derry, PA

Wastewater Treatment Plant Phase II - Mechanical Construction
Results
$100,000 to $125,000 est. value
Greencastle, PA 17225

Maintenance Service for Hydronic and Steam Systems
Term Contract
Bidding
Philadelphia, PA 19137

Reported 02/11/2022 12:00 AM
Project Title

Well No. 1 Nitrate Removal System Rehabilitation - General/Process Mechanical

Physical Address View project details and contacts
City, State (County) Lititz, PA   (Lancaster County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Mechanical, Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 01/17/22
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of but is not limited to demolition, temporary nitrate removal system installation, and the rehabilitation of an existing nitrate removal system. This includes, but is not limited to, piping, valving, instrumentation, electrical work, site restoration, and control system integration. Note: Upgrade equipment for existing nitrate removal and temporary nitrate removal systems have been pre-purchased by Owner.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents