Similar Projects
Andover Municipal Parking Hub - Town Hall Andover
Infrastructure
Conception
$350,000 CJ est. value
Andover, CT 06232

Andover Municipal Parking Hub - Town Hall Andover
Infrastructure
Conception
$350,000 CJ est. value
Andover, CT 06232

Tolland Fire Department Replacement of Stations - 440
Demolition, New Construction, Infrastructure - 4,600 SF
Design
$5,000,000 CJ est. value
Tolland, CT 06084

Public Works Facility - Town of Hebron
New Construction, Infrastructure - 17,800 SF
Design
$8,000,000 CJ est. value
Hebron, CT 06248

Wilbur Cross Cupola Repair
Renovation
Bidding
$500,000 CJ est. value
Storrs Mansfield, CT 06269

Maple Street Landscape and Hall Memorial Library Garden
Infrastructure
Bidding
$40,000 CJ est. value
Ellington, CT 06029

Vault B6 Pump Station
Infrastructure
Post-Bid
$326,777 CJ est. value
Storrs Mansfield, CT 06269

RFQ Construction Manager at Risk - South Campus Infrastructure
New Construction, Renovation, Infrastructure
Post-Bid
$62,500,000 CJ est. value
Storrs Mansfield, CT 06269

Student Union Office Renovations
- 1,000 SF
Results
$100,000 to $500,000 est. value
Storrs, CT 06269

Bio-Physics Cold Rooms
Renovation
Results
Storrs, CT

KinderCare / Vernon
New Construction, Infrastructure - 10,000 SF
Construction
$1,082,517 CJ est. value
Vernon Rockvl, CT 06066

KinderCare / Vernon
New Construction, Infrastructure - 10,000 SF
Construction
$1,082,517 CJ est. value
Vernon Rockvl, CT 06066

New Softball Complex - Miller Richardson Park - Town of Coventry
New Construction, Infrastructure
Pending Verification
$500,000 CJ est. value
Coventry, CT 06238

Able Coil and Electronics Co Expansion
Addition, Demolition, Infrastructure - 12,000 SF
Pending Verification
$1,500,000 CJ est. value
Bolton, CT 06043

Willington Fire Department
Addition, Demolition, Infrastructure
Design
$1,750,000 CJ est. value
Willington, CT 06279

Last Updated 12/18/2023 03:06 PM
Project Title

Freitas Renovation Phase 2

Physical Address View project details and contacts
City, State (County) Storrs Mansfield, CT 06269   (Tolland County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $645,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT DESCRIPTION/SCOPE OF WORK: The base scope of the project is the renovation/improvements of the women's volleyball locker/bathroom as well as the misc. electrical work in the Arena. This project also includes alternates for bidding. See alternates below. Alternate No. 1: Furnish and install new structural cold formed metal framing & (2) double doors between the Main Court and Practice Court as indicated on Sheet A101 - Floor Plan. Alternate No. 2: Provide renovation work in Sports Medicine/115 as indicated on Sheet Nos. A110 and A200. Alternate No. 3: Add lighting in entire Area to achieve 100 fc per national broadcast standards. Refer to electrical drawings and specifications. Alternate No. 4: Add new furred wall in the Arena to 8'-0" A.F.F. including impact resistant GWB. Paint access panels at junction box locations (2'x2'). Extend (2) return ducts to face of wall and provide open grill (32 SF free area) flush to wall. Typ. slope top at 45 degrees. COST PROPOSAL: Submit a Cost Proposal utilizing the Form provided. No substitution of the Form is permitted. MISCELLANEOUS REQUIRED DOCUMENTS: The Bid shall include the following documents: a. CT Department of Revenue Service Status Letter: Provide a Status Letter from the Connecticut Department of Revenue Services. This letter must be dated within the past three (3) months from the due date of this ITB. b. Summary of Revised Ethics Laws and Affidavits: Review the State of Connecticut Summary of Revised Ethics Laws and Affidavits document and upload the executed document where applicable. c. SEEC Form 10: Review the SEEC Form 10: Notice to Executive Branch State Contractors and Prospective State Contractors of Campaign Contribution and Solicitation Limitations (acknowledgment of receipt of the explanation of prohibitions) and upload the executed Form where applicable. The Form can be found at: https://seec.ct.gov/Portal/data/forms/ContrForms/seec_form_10_final.pdf. d. Bidder Contract Compliance Monitoring Report: Review the Commission on Human Rights and Opportunities Bidder Contract Compliance Regulations Notification to Bidders and upload the completed Report where applicable. The Form can be found at: https://portal.ct.gov/- /media/DDS/conversion/NotificationtoBidders1.pdf. e. Bid Security: Provide a copy of a Bid Bond made out in the penal sum of ten percent (10%) of the Total Bid Amount. In lieu of a Bid Bond, a Certified Check in the amount of ten percent (10%) of the Total Bid Amount is acceptable. A Bid Bond is only required for any Total Bid Amount over $50,000.00. A Total Bid Amount of $50,000.00 or less does not require a Bid Bond. f. Bonding Capacity: Provide a letter from your bonding company or representative confirming bonding capacity and include if they have ever had to complete or finance work on your behalf. Bonding capacity shall be for, at a minimum, the Total Bid Amount submitted for this Project. SET-ASIDE REQUIREMENTS: The Set-Aside Requirement for this Project is that (1) not less than thirty percent (30%) of the Total Contract Price be awarded to subcontractors who are certified by the Connecticut Department of Administrative Services as "Small Business Enterprises" ("SBEs") and (2) not less than ten percent (10%) of the Total Contract Price be awarded to subcontractors who are certified by the Connecticut Department of Administrative Services as "Minority Business Enterprises" ("MBEs") (the 10% set aside for MBEs may be included in the 30% set aside for SBEs). If the Contractor is an S/MBE, then any self-performed work may be included in the Set-Aside Requirement. The Contractor is responsible for ensuring that they, and the S/MBEs they have selected, are eligible Connecticut-certified S/MBE contractors. Question Deadline 11/28/2023 2:00 PM LIQUIDATED DAMAGES: Liquidated Damages of FIVE HUNDRED DOLLARS ($500.00) per calendar day shall be assessed if the Contractor fails to achieve Substantial Completion or causes delay to the Substantial Completion of any portion of the work within the Contract Time. WAGE RATES: Prevailing Wages are required for this Project if the total cost of all work to be performed by the Contractor and Subcontractors is $100,000.00 or more and subject to Connecticut General Statutes 31-53, 31-54, and 31-55: https://www.cga.ct.gov/current/pub/chap_557.htm#sec_31-53.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents