Similar Projects
North Rockwell, Wilshire, Britton - North Rockwell Avenue from West Wilshire Boulevard to West Britton Road (Ward 1) - City of Oklahoma City
Alteration
Conception
$1,320,000 est. value
Oklahoma City, OK 73195

SE 104, Henney to Choctaw Rd - SE 104th St from S Henney Rd to S Choctaw Rd (Ward 4) - City of Oklahoma City
Infrastructure
Conception
$545,000 est. value
Oklahoma City, OK 73195

Utilities - US 64
Infrastructure
Design
Less than $300,000 est. value
Alva, OK

Utilities - SH 69A
Infrastructure
Design
$309,000 est. value
Miami, OK 74354

Wash Pad Improvements - Three Forks Harbor
Infrastructure
Bidding
$515,000 est. value
Fort Gibson, OK 74434

Davis S. Project
Infrastructure
Bidding
$50,000 est. value
Oklahoma City, OK

New Splash Pad at the Atoka Sports Complex
New Construction, Infrastructure
Post-Bid
Less than $250,000 est. value
Atoka, OK 74525

AMI-AMR Water and Electric Meters
Infrastructure
Post-Bid
Lindsay, OK

100-200 Block East Garriott Road Waterline Relocation
Results
Enid, OK

1500-2500 Block of North Cleveland Street Waterline Relocation
Results
Enid, OK 73703

Sara Rd, NW 23 to NW 36 - Sara Road from NW 23rd St to NW 36th St (Ward 1) - City of Oklahoma City
Infrastructure
Conception
$550,000 est. value
Oklahoma City, OK 73195

I-44 - Utilities
Alteration
Design
$2,074,299 est. value
Tulsa, OK 74145

32nd Avenue Water Line Replacement
Infrastructure
Bidding
$200,000 est. value
Stillwater, OK 74074

Construction of Section A and B
Infrastructure
Post-Bid
Taft, OK

54th Street Lift Station Capacity Improvement Program
New Construction
Results
Enid, OK 73701

Last Updated 07/13/2022 12:26 AM
Project Title

Forster Drive Waterline Relocation - Construction of Lift Station No. 4

Physical Address View project details and contacts
City, State (County) Mustang, OK 73064   (Canadian County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents