Similar Projects
Udot AVL (Approved Vendor List)- Hot Mix Asphalt
Term Contract
Bidding

Y--Price Canyon Recreation Site Road Improvements
Term Contract
Bidding
$1,000,000 to $5,000,000 est. value

UT FTFW OURA 11(1), Auto Tour Route
Post-Bid
$250,000 to $750,000 est. value
Fort Duchesne, UT 84026

Chip Seal Material for Region Three
Term Contract
Post-Bid

Uintah County West Side Chip Seal
Results
Less than $1,153,392 est. value
Vernal, UT 84078

UTSSD Seep Ridge Road - Ouray Bottom Project
Results
Less than $2,163,350 est. value
Vernal, UT 84078

Untreated Base Course
Term Contract
Post-Bid

Red Fleet Road Improvement Project
Results
Less than $204,761 est. value
Vernal, UT 84078

Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

US-191; Steinaker Overlook to Stauffer Chemical
Results
$1,500,000 to $3,000,000 est. value
UT

UT Flap 2500(1) Taylor Mountain Road
Renovation
Post-Bid
$6,000,000 to $8,000,000 est. value
Vernal, UT

District Asphalt Repair Projects
Results
Vernal, UT 84078

Parking Lot Seal Coat Project
Results
Vernal, UT

US-40 MP 125.3 to SR-88
Results
$4,000,000 to $6,000,000 est. value
UT

SR-121, MP 34.4 to US-40; US-40, MP 143.5 - MP 145 Rehabilitation High Volume
Results
$3,000,000 to $4,000,000 est. value
UT

Last Updated 05/27/2021 04:56 PM
Project Title

Woods Road Overlay

Physical Address View project details and contacts
City, State (County) UT   (Uintah County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,775,250
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of the Woods Road Overlay Project, which includes approximately 17,600 tons of hot mix asphalt applied as a 2-inch overlay to approximately 7.9 miles of the roadway, and related work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents