Similar Projects
Last Updated | 06/26/2020 09:06 AM |
Project Title | First Street Culvert Replacement |
Physical Address | View project details and contacts |
City, State (County) | Archbald, PA (Lackawanna County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work consist of removing all of the existing undersized concrete culvert approximately 60 ft. across 1st street. Also existing inlets that drain into the culvert will be removed. A new adequately sized culvert, approximately 6x4, will be Installed in the same location. The new type M inlets will also be placed to capture roadway gutter flow. New inlets will drain into the new culvert. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |