Similar Projects
RFQ Engineering - Four (4) Bridges, Engineering Design and Construction Services
Infrastructure
Conception
$400,000 CJ est. value
Leavenworth, KS 66048

RFP Design - Regional Transportation Capital Improvement Plan
Infrastructure
Conception
$1,000,000 CJ est. value
Tonganoxie, KS 66086

Site Plan - Eye Doctor
New Construction, Infrastructure - 2,928 SF
Design
$1,701,168 CJ est. value
Lansing, KS 66043

Grading and Surfacing
Infrastructure
Bidding
$2,000,000 CJ est. value
Tonganoxie, KS 66086

2023 Pavement Management Program, Crack Seal and Micro-surfacing
Infrastructure
Bidding
$3,000,000 CJ est. value
Leavenworth, KS 66048

RFP D/B - Federal Correctional Institute (FCI) - City of Leavenworth
New Construction, Infrastructure
Post-Bid
$300,000,000 CJ est. value
Leavenworth, KS 66048

Tomahawk Park - Phase 1
Infrastructure
Post-Bid
$200,000 CJ est. value
Basehor, KS 66007

1st Street, Olive Street to Nina Street Water Main Replacement
Infrastructure
Results
Lansing, KS

Leavenworth Waterworks 2022 Cherokee Watermain Improvements
Infrastructure
Results
$200,000 est. value
Leavenworth, KS

Whiskey Ridge Distillery
New Construction, Infrastructure - 6,000 SF
Pending Verification
$650,000 CJ est. value
Stranger, KS 66086

Pinehurst 2 Retail Development
New Construction, Infrastructure - 11,450 SF
Pending Verification
$3,000,000 CJ est. value
Basehor, KS 66007

RFQ Engineering - ST-100 Bridge Replacement
Infrastructure
Conception
$400,000 CJ est. value
Basehor, KS 66007

Grading, Bridge and Surfacing
Infrastructure
Bidding
$2,000,000 CJ est. value
Tonganoxie, KS 66086

RFQ Contractor - New City Hall Facility
New Construction, Infrastructure
Post-Bid
$4,000,000 CJ est. value
Basehor, KS 66007

2022 Pavement Management Program, Crack Seal and Mirco-Surfacing
Infrastructure
Results
$777,488 CJ est. value
Leavenworth, KS 66048

Last Updated 03/10/2023 07:03 PM
Project Title

2023 Water System Improvements

Physical Address View project details and contacts
City, State (County) Linwood, KS 66052   (Leavenworth County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $828,929 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Installation of 6,664 linear feet of waterline 2" to 6", 8 fire hydrants, and 79 service assemblies. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: Abby Mills, P.E., CFM Project Manager abby.mills@bgcons.com

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents