Similar Projects
North Greenwood Community Redevelopment Plan
New Construction
Conception
Clearwater, FL

Schooner Resort Hotel
New Construction, Build-Out, Demolition
Design
Madeira Beach, FL

Schooner Resort Hotel
New Construction, Build-Out, Demolition
Design
Madeira Beach, FL

Transitional Facility - Interior Renovation
Renovation
Post-Bid
$500,000 CJ est. value
Newark, NJ 07108

770 Apartments
New Construction - 79,981 SF
Post-Bid
$3,000,000 est. value
Saint Petersburg, FL 33701

Mill and Overlay on Various Street Locations
Results
$1,089,600 est. value
Dunedin, FL

Jamestown Apartments Renovations, Phase 3-G, Sheltered
Renovation
Results
Saint Petersburg, FL 33705

Gallery 3100
New Construction
Construction
$12,251,375 est. value
Saint Petersburg, FL 33712

Gallery 3100
New Construction
Construction
$12,251,375 est. value
Saint Petersburg, FL 33712

The Miramar Beach Resort
Demolition, New Construction, Infrastructure
Pending Verification
$14,300,000 CJ est. value
St Pete Beach, FL 33707

The Miramar Beach Resort
Demolition, New Construction, Infrastructure
Pending Verification
$14,300,000 CJ est. value
St Pete Beach, FL 33707

Sea Captain Hotel
New Construction, Renovation - 7,885 SF
Design
$18,000,000 est. value
Clearwater, FL 33767

Pinellas County Jail Secure Entry Center (SEC) - Pinellas County
New Construction, Infrastructure
Post-Bid
$14,880,000 CJ est. value
Clearwater, FL 33762

Construction of Oldsmar Trail Phase 6 from Stevens Avenue
Infrastructure
Results
Oldsmar, FL 34677

Central Park Food Hall
Renovation - 24,000 SF
Construction
Saint Petersburg, FL 33701

Last Updated 03/14/2023 05:34 PM
Project Title

1st Avenue North Mixed-Use Development

Physical Address View project details and contacts
City, State (County) St Petersburg, FL 33701   (Pinellas County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Fitness Center, Food/Beverage Service, Hotel/Motel, Office, Parking Garage, Paving/Reconstruction, Retail, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected May 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $47,300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the new construction of a 120 to 140 hotel, 7,000 to 8,000-square-feet of restaurant space and either apartments or condominiums on the upper floors. Scope details and the hotel brand have not been released. As of March 2023, construction documents are complete and were submitted for permit review in June 2022. The owner is in the process of selecting a general contractor. The construction timeline has not been determined.

Details

,, 73,500 SF - New Construction, New Construction. 14,000 SF. 7,000 SF. 52,500 SF. New Construction, New Construction. Parking Spaces, 264 Parking Spaces.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Specialty Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Loading Dock Equipment, Refrigerated Display Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Window Treatments, Window Blinds, Curtains and Drapes, Casework, Countertops, Furnishings and Accessories, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Hospitality Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment, Central Cooling Equipment, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents