Similar Projects
Replace HVAC Equipment District 7 Headquarters Louisiana Department of Wildlife and Fisheries Baton Rouge, Louisiana
Alteration
Bidding
$200,000 est. value
Baton Rouge, LA 70808

Henderson Lake Dixie Pipeline Spoil Bank Hydrologic Restoration
Infrastructure
Bidding
$1,155,080 CJ est. value
Baton Rouge, LA 70802

Furnish Labor and Materials for Residential College: Boiler Replacement
Renovation
Sub-Bidding
$100,000 CJ est. value
Baton Rouge, LA 70802

HVAC Maintenance for Secretary of State and Old State Capitol
Term Contract
Sub-Bidding
Baton Rouge, LA 70802

Gymnasium HVAC Installation
Alteration
Post-Bid
Baton Rouge, LA 70802

Commercial Fan Coils - DOC
Alteration
Post-Bid
Baton Rouge, LA 70802

HVAC Preventive Maintenance
Results
Tampa, FL - Baton Rouge, New Orleans, LA - Austin, Benbrook, El Paso, Fort Worth, Haltom City, Horizon City, Houston, Kyle, Odessa, Pflugerville, Round Rock, San Antonio, Socorro, TX 78227

Hvac Maintenance
Alteration
Results
Baton Rouge, LA

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

HVAC Maintenance for DPS
Alteration
Results
Baton Rouge, LA

HVAC Replacement Dodson Hall
Alteration
Post-Bid
Baton Rouge, LA

Chiller Preventive Maint - DMA
Term Contract
Results
Baton Rouge, LA

NASA Environmental Restoration and Compliance Contract (NERCC)
Term Contract
Post-Bid

HVAC Duct Cleaning
Alteration
Results
Baton Rouge, LA

160 Tons Cooling Tower
Alteration
Post-Bid
Baton Rouge, LA

Last Updated 08/05/2022 02:33 PM
Project Title

Replace HVAC Equipment

Physical Address View project details and contacts
City, State (County) Baton Rouge, LA 70808   (East Baton Rouge County)
Category(s) Single Trades
Sub-Category(s) Environmental, HVAC
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Electrical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Questions about this procedure shall be directed to the Designer at: Salas O'Brien, LLC 2380 Town Center Blvd Ste 1210 Baton Rouge, LA 70806 Telephone: 225-766-8002 E-mail: Morgan McGlone (morgan.mcglone@salasobrien.com) All bids shall be accompanied by bid security in an amount of five percent (5.0%) of the sum of the base bid and all alternates. The form of this security shall be as stated in the Instructions to Bidders included in the Bid Documents for this project. The successful Bidder shall be required to furnish a Performance and Payment Bond written as described in the Instructions to Bidders included in the Bid Documents for this project. Bids shall be accepted from Contractors who are licensed under LA. R.S. 37:2150-2192 for the classification of Mechanical Work. Bidder is required to comply with provisions and requirements of LA R.S. 38:2212(B)(5). No bid may be withdrawn for a period of forty-five (45) days after receipt of bids, except under the provisions of LA. R.S. 38:2214. The Owner reserves the right to reject any and all bids for just cause. In accordance with La. R.S. 38:2212(B)(1), the provisions and requirements of this Section and those stated in the bidding documents shall not be waived by any entity. When this project is financed either partially or entirely with State Bonds or financed in whole or in part by federal or other funds which are not readily available at the time bids are received, the award of this Contract is contingent upon the granting of lines of credit, or the sale of bonds by the Bond Commission or the availability of federal or other funds. The State shall incur no obligation to the Contractor until the Contract Between Owner and Contractor is fully executed. Facility Planning and Control is a participant in the Small Entrepreneurship (SE) Program (the Hudson Initiative) and the VeteranOwned and Service-Connected Disabled Veteran-Owned (LaVet) Small Entrepreneurships Program. Bidders are encouraged to consider participation.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents