Similar Projects
Retainer Contracts for Asphalt Paving, Sealing & Striping Services Statewide
Term Contract
Bidding

2021 Paving
Bidding
Springfield, VT

Cavendish-Weathersfield ER STP 0146 (14)
Results
$500,000 to $1,000,000 est. value
Cavendish, Weathersfield, VT 05142

2020 Paved Highway Rehabilitation
Results
$1,400,000 est. value
Sharon, VT 05065

Pomfret Pavement Rehabilitation
Results
$690,000 est. value
Pomfret, VT

Replace Asphalt Pavement, North Hartland Lake, North Hartland, VT
Results
North Hartland, VT

Hartford Roundabouts and Sidewalk
Results
$5,000,000 to $10,000,000 est. value
Hartford, VT 05001

Commonwealth Avenue Paving Project
Results
Ludlow, VT 05149

Route 35 Improvements Phase 3
Results
$206,245 est. value
Chester, VT 05143

Windsor-Hartland STP FPAV (31)
Term Contract
Results
$2,500,000 to $5,000,000 est. value
Hartland, Windsor, VT 05089

Sharon-Bethel IM 089-1 (66)
Term Contract
Results
$5,000,000 to $10,000,000 est. value
Bethel, Sharon, VT 05065

South Main Street Utility and Roadway Improvements Project
Results
$2,560,000 est. value
Hartford, VT

Statewide STP Crak (40)
Results
$500,000 to $1,000,000 est. value

Statewide STP Crak (39)
Results
$500,000 to $1,000,000 est. value

2020 Crack Sealing
Results
Sharon, VT

Last Updated 06/08/2020 11:38 AM
Project Title

Pleasant and Terrace Street Roadway Rehabilitation and Elm, Crystal and Hall Street Complete Roadway and Utility Reconstruction Project

Physical Address View project details and contacts
City, State (County) Windsor, VT   (Windsor County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Rehabilitation of Cherry, Pleasant and Terrace Street (1500 LF) includes the following tasks: milling and overlay of 360 LF of Cherry Street concrete pavement, full depth reclamation of 1140 LF remainder of the roadways and minor regrading and curbing installation with new pavement. The Reconstruction of Elm, Crystal, and Hall Street (1530 LF) includes the following tasks: full drainage, water and sewer replacement including service lines, vertical granite curbing, sidewalk and replacement of selects, regrading of vertical alignment and installation of new pavement, construction of cross-country storm drain (325 LF) with outlet control structures and water quality pond and concrete transitions to existing walks and reestablishment of vegetation.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents