Similar Projects
Engineering, Inspection Services Construction Project Lead, Daytona Beach, FL 32100 (Volusia County)
Last Updated | 06/02/2020 01:44 AM |
Project Title | Derbyshire Sidewalks Phase II - CEI Services |
Physical Address | View project details and contacts |
City, State (County) | Daytona Beach, FL 32100 (Volusia County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering, Inspection Services |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construction engineering inspection services for the Derbyshire Sidewalks Phase II project to include overseeing the construction activities of the contractor performing the construction work described in the construction plans. The project involves construction of 6' wide concrete sidewalk to fill gaps in the pedestrian system on the north, south, and east side of the Derbyshire Regional Park in Daytona Beach. All concrete sidewalk shall be 4" thick except for driveway and other turnout locations, those locations should have 6" thick concrete sidewalk. The total project length is approximately 9,192 LF. The proposed sidewalk locations are the following: 1. 4th Street from Lewis Dr. to Derbyshire Rd. (south side) 499 LF, .09 miles 2.5th Street from Lewis Dr. to Derbyshire Rd. (south side) 352 LF, .07 miles 3. 6th Street from Derbyshire Rd. to Vine St. (south side) 1,695 LF, .32 miles 4. Vine Street from 4th Street to 6th Street (west side) 984 LF, .19 miles 5. Vine St. from Brentwood Dr. to Mason Av. (west side) 933 LF, .18 miles 6. Brentwood Dr. from Berkshire Rd. to Derbyshire Rd. (south side) 742 LF, .14 miles 7. Brentwood Dr. from Derbyshire Rd. to Nova Rd. (north side) 2,947 LF, .56 miles 8. Derbyshire Rd./3rd St. inter. (incl. crosswalk and ADA ramp to exist sidewalk) 7LF. The improvements include: Mobilization, Maintenance of Traffic, Erosion Control, inlet protection, Clearing and grubbing, Excavation, signing and pavement markings, utility adjustments, drainage improvements (piping ditches, inlet installation, manhole installation ), concrete sidewalk, curb installation, detectable warning surfaces, fence installation and relocation, mailbox installation, sodding, drainage improvements, concrete sidewalk, pedestrian handrail, rapid reflective flashing beacon (RRFB), pavement markings, and sodding. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |