Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Pavement Improvements at Vasona Lake West Trail
Infrastructure
Bidding
$2,000,000 est. value
Los Gatos, CA 95032

2022 LS Resurfacing 4 (2018 Measure T)
Infrastructure
Bidding
$50,001 to $100,000 est. value
San Jose, CA

South Loop Project
Infrastructure
Post-Bid
Santa Clara, CA 95134

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Removal and Replacement of Concrete within the Public Right-Of-Way
Infrastructure
Results
San Jose, CA

Lawrence Expressway Pavement Rehabilitation Project Between US-101 and SR-237
Infrastructure
Results
Santa Clara, CA 95056

Pavement Improvements at Ed R. Levin County Park-Sandy Wool Group Area
Infrastructure
Bidding
$95,000 est. value
San Jose, CA

Mt Eden Road Shoulder Stabilization Project
Infrastructure
Post-Bid
$105,900 est. value
Saratoga, CA 95070

General Engineering (A License) Construction, San Francisco, San Mateo, Santa Clara, and Alameda Counties
Infrastructure, Alteration
Results
$5,000,000 est. value

Tully Road Safety Improvements Project
Infrastructure
Bidding
$5,483,945 est. value
San Jose, CA 95154

Addison Avenue Safe Route to School and Green Street Improvements
Alteration
Post-Bid
Palo Alto, CA

As-Needed Asphalt and Concrete Repair and Replacement Services
Term Contract
Results
Santa Clara, CA

2022 Steven Creek Boulevard and Winchester Boulevard Resurfacing Project
Infrastructure
Bidding
$11,522,051 est. value
Santa Clara, CA 95050

Trail Thompson Creek (Quimby Road-Aborn Court)
Infrastructure
Post-Bid
$1,090,000 est. value
San Jose, CA 95154

Last Updated 05/12/2022 12:31 AM
Project Title

East Dunne Avenue Rehabilitation

Physical Address View project details and contacts
City, State (County) Morgan Hill, CA 95037   (Santa Clara County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,370,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project is located at East Dunne Avenue, from lower Thomas Grade to the eastern City limit, Morgan Hill, CA 95037, and the Project’s Scope of Work is described as follows, but not limited to: Pavement milling and conform grinding, full depth asphalt concrete (AC) pavement repairs, hot mix AC overlay, AC berm, crack sealing, replacement of all traffic delineation and markings, utility cover adjustments, and all related work on various streets within City limits.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents