Similar Projects
Last Updated | 10/06/2021 08:20 AM |
Project Title | Complete Streets Improvements along Gliniewicz Way and Lincoln Boulevard |
Physical Address | View project details and contacts |
City, State (County) | Abington, MA 02351 (Plymouth County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $370,668 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | DCAMM Certification Required. Construction of approximately 1,100 linear feet of shared-use path on the north side of Lincoln Blvd., from Washington St. to Bedford St., continuing on Gliniewicz from Bedford St. to the first entrance of the High School. consists of furnishing all necessary labor, materials and equipment required to provide pedestrian and bicycle safety improvements along Gliniewicz Way and Lincoln Boulevard. The work includes removing and resetting granite curb and edging, installation of new granite curb and edging, full depth construction of hot mix asphalt shared use path, mill and overlay of hot mix asphalt shared use path, and cement concrete curb ramps, reconstruction of landscape median islands, installation of steel backed timber guardrail, signs, pavement markings, and other miscellaneous items of work required. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |