Similar Projects
1811 Robert Jenkins House
Renovation
Conception
$500,000 to $1,000,000 est. value
Hudson, NY 12534

Hospitality Areas
Renovation
Conception
Saratoga Springs, NY 12866

Pepper Woods
New Construction
Design
$32,000,000 est. value
Colonie, NY 12110

48 Pelham Mixed Use
New Construction - 4,431 SF
Design
$3,000,000 est. value
Pelham, NY 10803

George K Arthur Community Center Year 47 Facilities Improvements
New Construction
Bidding
$640,000 est. value
Buffalo, NY 14211

George Young Community Center Cupola Restoration - Re-bid
Renovation
Bidding
$96,400 CJ est. value
Riverhead, NY 11901

907 Michigan Avenue Community Intake Center
Demolition, New Construction, Infrastructure, Renovation - 5,700 SF
Sub-Bidding
$500,000 CJ est. value
Buffalo, NY 14204

Ontario Beach Park Robach Community Center Door and Window Replacement Project
Renovation
Sub-Bidding
$200,000 CJ est. value
Rochester, NY 14612

Main Street Apartments
New Construction - 160,000 SF
Post-Bid
$51,000,000 est. value
Peekskill, NY 10566

Alexan Westchester
New Construction - 770,146 SF
Post-Bid
$50,000,000 est. value
Harrison, NY 10604

Cascadilla Boathouse Restoration
Renovation - 9,465 SF
Results
Ithaca, NY 14850

Haverstraw Recreation Complex - Phase 1
Renovation
Results
Haverstraw, NY 10927

42 Broad Street West - Fleetwood
New Construction - 354,000 SF
Construction
$95,000,000 est. value
Mount Vernon, NY 10550

Saint Regis Residences Rye
New Construction, Demolition - 245,000 SF
Construction
$100,000,000 est. value
Rye, NY 10580

11th Avenue Development
New Construction - 1,338,715 SF
Pending Verification
$10,000,000 CJ est. value
New York, NY 10018

Last Updated 08/02/2022 12:31 PM
Project Title

Senior Center Renovation 15 Drew Avenue

Physical Address View project details and contacts
City, State (County) Highland Falls, NY 10928   (Orange County)
Category(s) Entertainment/Recreation
Sub-Category(s) Clubhouse/Social Club
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $143,300 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Please note the Village requires any prospective bidder to pick up hard copies at the Village office or the Office of the Engineer. Only said hard copies will be accepted as a valid bid submission. The principal features of the Work to be performed for this Project include: Installation of new HVAC ducts, drop ceiling, windows, lighting, patio pavers, kitchen cabinetry, and concrete handicap ramp. The foregoing is a general description only and shall not be construed as a complete description of the Work to be performed for this Project. One Bid will be received. Bids shall be on a unit price basis. Prevailing wages established under the Davis-Bacon act will apply to this Contract. Prospective bidders requests for mailing of Contract Documents will be filled by Federal Express or UPS. Prospective bidders shall furnish a prepaid Air Bill. Neither the OWNER nor the ENGINEER will be responsible for full or partial sets of Contract Documents, including any Addenda, obtained from other sources. Bid security, and proof of qualifications to perform the Work shall be as described in the Instructions to Bidders. Bidders shall comply with all special and statutory requirements in accordance with the Instructions to Bidders. Contract time of commencement and completion will be as specified in the Agreement. Each bid shall be accompanied by, a Bid Bond, the coverage of which is specified in the Instructions to Bidders. The Bid Bond Form is contained herein as part of the Contract Documents. Bonding Firm must be listed in OMB Circular 570. Prevailing Wage Rates under Davis Bacon and MBE/WBE, as applicable, apply to this Contract. This project is subject to the provisions of Article 5-A of the General Municipal Law of the State of New York and certificates required thereunder shall be available for public inspection at the office of the Village Clerk, Village of Highland Falls, NY. For any reason whatsoever or for no reason the Village reserves the right to waive any informalities in the bids or to reject any and all bids. No bidder may withdraw his bid except by written request submitted at least twenty- four hours before the time for opening or until the lapse of 90 days after the actual opening thereof. The Village is exempt from payment of sales and compensating use taxes of the State of New York and of Cities and Counties on all materials to be incorporated into the Work. These taxes shall not be included in the Bid. The Village will furnish the required certificates of tax exemption to the CONTRACTOR for use in the purchase of supplies and materials to be incorporated into the Work. The Village's exemption does not apply to construction tools, machinery, equipment or other property purchased by or leased by the CONTRACTOR, or to supplies or materials not incorporated into the Work. Non Discrimination and Affirmative Action Policy: It is the policy of the Village that their Contractors shall comply with all Federal, State, and local law, policy orders, rules and regulations which prohibit unlawful discrimination against any employee or applicant for employment because of race creed, color, or national origin, sex, sexual orientation, age, disability or marital status and will take affirmative action to insure that they are afforded equal employment opportunities. Provisions concerning this requirement are detailed in the Supplementary Conditions.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Unit Kitchens, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents