Reported 01/04/2019 12:00 AM
Project Title

Switching Equipment Replacement

Physical Address View project details and contacts
City, State (County) Augusta, ME 04330   (Kennebec County)
Category(s) Single Trades
Sub-Category(s) Security/Communications
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Scope: 1. Replace current switching equipment that is running 1 gig inter-building backbones and 100 Meg user connections with equipment running 10 gig inter-building backbones and 1 gig user connections. All buildings are currently wired with Cat5E or Cat6 cabling capable of supporting 1 gig network speeds. No additional wiring is being requested. 2. Switching equipment must be capable of running all Wireless and Phone equipment utilizing POE+ architecture. 3. Switching equipment must be compatible with Mitel VoIP equipment. It is the desire of the School Department to replace all older IP communications equipment Supplying Connectivity to its five buildings. Upgrading all end user ports in Cony CATC & Gilbert School from 100 MB 1 Gig: 1. Cony High School / CATC 60 Pierce Drive Augusta Maine 04330 2. Farrington Elementary School 249 Eastern Ave Augusta Maine 04330 3. Gilbert Elementary School 16 Sunset Drive Augusta Maine 04330 4. Lincoln Elementary School 30 Lincoln Street Augusta Maine 04330 5. Hussey Elementary School 12 Gedney Street Augusta Maine 04330
Details
Division 26 - Electrical.
Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents