Similar Projects
Palmetto Creek Watershed Structure 1
Results
GA

Glen Emerald Lake Dam Repair
Results
GA

Settingdown 4, 6, 54, and 59 Watershed Dam Maintenance
Results
Atlanta, GA 30334

Rock Weir Dam to Provide Fish Passage in Augusta, GA
New Construction
Post-Bid
$10,000,000 est. value
Augusta, GA 31805

Initial Sitework for the Fish Passage at the New Savannah Bluff Lock & Dam
Design
$1,000,000 to $5,000,000 est. value
Augusta, GA

Dam Renovation Plans of Melody Lakes Dam
Results
Waverly Hall, GA

Russell Creek Reservoir Dam And Spillway System
Renovation
Post-Bid
Dawsonville, GA

Tally Green Pond Improvements
Renovation
Sub-Bidding
Marietta, GA 30068

North Broad River No.33 Watershed Structure Remedial Spillway Repair
New Construction
Bidding
Martin, GA 30557

Last Updated 05/05/2021 09:23 AM
Project Title

Noonday Creek Watershed Structure #17

Physical Address View project details and contacts
City, State (County) Atlanta, GA   (Cobb County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves the construction/rehabilitation related to the high hazard dam known as Noonday Creek Watershed Dam #17 in Cobb and Cherokee Counties, Georgia. The purpose of the project is to address safety concerns and reduce the potential for loss of life due to the dam’s failure in a safe and environmentally acceptable manner that meets state and federal standards. The scope of work for the project involves upgrades to the existing earthen dam including, construction of a Roller Compacted Concrete (RCC) chute spillway, reinforced concrete stilling basin, cutoff wall, and training walls with underdrains. The proposed action also includes construction of subsurface drainage systems, possible rock excavation and on-site earth fill.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents