Similar Projects
Watershed Pointe / Divide Highway
New Construction, Infrastructure
Conception
$11,700,000 CJ est. value
Little Rock, AR 72212

Fox Meadow Subdivision
New Construction, Infrastructure - 35,000 SF
Design
$3,900,000 CJ est. value
Siloam Springs, AR 72761

Sultana Museum and Interpretive Exhibits
Renovation, Infrastructure - 23,000 SF
Design
$400,000 CJ est. value
Marion, AR 72364

Desha Co. Surfacing No. 16 (S)
Infrastructure
Bidding
$670,420 CJ est. value
Dumas, AR 71639

Gillham, Grannis, & Hatfield Overlay (S)
Infrastructure
Bidding
$1,843,845 CJ est. value
Mena, AR 71953

Construction of AWIN Tower Site Work Designs
Infrastructure
Post-Bid
Little Flock, AR

Repairs and Improvements to the Jacob Wolf House Historic Site
Infrastructure
Post-Bid
Norfork, AR 72658

New Walking / Biking Trail on the Campus of ASU-MTN
Results
Mountain Home, AR

Big Creek Road Bridge Construction
New Construction
Results
Batesville, AR

McReynolds Recreational Vehicle Park
New Construction
Construction
Siloam Springs, AR 72761

SW 4th and B Street Townhomes
New Construction, Infrastructure - 10,451 SF
Construction
$2,000,000 CJ est. value
Bentonville, AR 72712

Morning Star Subdivision
New Construction, Infrastructure
Pending Verification
$45,000,000 CJ est. value
Bentonville, AR 72712

Big Red Convenience Store / Hot Springs
New Construction, Infrastructure - 4,100 SF
Pending Verification
$1,000,000 CJ est. value
Hot Springs, AR 71913

Metro Business and Space Center
New Construction, Infrastructure - 112,258 SF
Design
$12,100,000 CJ est. value
Rogers, AR 72758

Antoine and Blevins Overlay (S)
Infrastructure
Bidding
$549,553 CJ est. value
Antoine, AR 71922

Last Updated 01/06/2023 09:02 AM
Project Title

RFQ Contractor - Bridge Bearing Replacement, Norfork Dam Spillway Bridge

Physical Address View project details and contacts
City, State (County) Mountain Home, AR 72653   (Baxter County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

SOURCES SOUGHT SYNOPSIS BRIDGE BEARING REPLACEMENT NORFORK DAM SPILLWAY BRIDGE U.S. ARMY CORPS OF ENGINEERS (USACE) LITTLE ROCK DISTRICT (SWL) This is a SOURCES SOUGHT announcement; a market survey for information only, to be used for preliminary planning purposes. This is not a solicitation for proposals and no contract will be awarded from this synopsis. No reimbursement will be made for any costs associated with providing information in response to this synopsis or any follow up information requests. Respondents will not be notified of the results of the evaluation. The purpose of this synopsis is to gain knowledge of interest, capabilities, and qualifications of various members of industry, to include the Other than Small and the Small Business Community: Small Business, Section 8(a), Historically Underutilized Business Zones (HUBZone), Service-Disabled Veteran-Owned Small Business (SDVOSB), and Woman-Owned Small Business (WOSB). The Government must ensure there is adequate competition among the potential pool of responsible contractors. Small business, Section 8(a), HUBZone, SDVOSB, and WOSB are highly encouraged to participate. Small Businesses participants are reminded under FAR 52.219-14, Limitations on Subcontracting (Deviation 2021-O0008) for supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract. Prior Government contract work is not required for submitting a response under this Sources Sought Synopsis. Interested Firms shall respond to this Sources Sought Synopsis no later than 2:00 PM CST on January 19, 2023. The North American Industry Classification System code for this procurement is 332991, Ball and Roller Bearing Manufacturing, which has a small business size standard of 1,250 employees. The Product Service Code is Z2LB, Repair or Alteration of Highways/ Roads/ Streets/ Bridges/ Railways. Estimated magnitude of construction is between $1M and $5M. Estimated duration of the project is 404 calendar days. All interested firms must be registered in System for Award Management (SAM) to submit bids/ quotes/ proposals on Government solicitations. Responses should be addressed to: sarah.n.hagood@usace.army.mil Project Description Reference drawings are provided and attached. A total of 12 rocker bearings on the downstream side need to be replaced and one single rocker bearing on the upstream side. The fixed bearings will not be replaced, work completed on those will only consist of pressure washing and or sandblasting, then painting. The spillway bridge over Norfork Dam has a total of 12 spans between the dam piers. The spans are separated by an open median with a grating and each span acts independently between upstream and downstream. The bridge is composed of simply supported reinforced concrete slabs, upstream measuring 10-foot, 9-inches in width and downstream measuring 11-foot, 2- inches in width at the bases. The slabs are each 4 feet thick and have a length of 43 feet measured from center to center of bearings and a total length of approximately 48 feet, 0 inches. The dimensions described here in does not include the parapets, curbs, median and sidewalks. The bridge bearings consists of a single steel rocker bearing on one side of the span and a convex steel fixed bearing on the opposite end. The bearings run the full width of the bridge span. The rocker bearings are recessed from the top of the pier by 11 inches and set back from the face of the pier by 12 inches, the recess was then filled with bituminous material which has hardened and prevents movement. The approximate distance between the top of the pier and the bottom of the bridge spans measures from 2.0 inches to 2.5 inches. Due to the continuous length bearing across the full base width of the span there is sufficient bearing area to allow cutting out a small section of the bearing out on each side to place jacks. The concrete encasing the bearing will need to be saw cut and jack hammered out with jacks placed on the edge of the bridge span width to make the lift. Saw cutting out material prior to lifting is due to the limited space between the top of pier and bottom of bridge span. The existing steel rocker bearings will be replaced with a set (two) of reinforced elastomeric bearing pads, one installed on either side of the bridge width in accordance with the drawings. The existing embedded steel plate on the bottom of the bridge span will remain in place and have a new bearing plate welded to it and hand packed with grout (this is not shown in the drawings). The existing bearing will be placed with a bearing plate on bottom and then concrete placed up to the bottom elevation of the bearing plate. The working space to complete the work is very limited. On the downstream side are Tainter gates (radial gates) that regulate releases of water from the dam. The distance from the top of these gates to the bottom of the bridge span is very limited as seen in the attached drawing set. The Prime Contractor must have the following certifications: 1. AISC Certified Bridge Fabricator a. AISC Quality Certification Program, Major Steel Bridges (CBR) OR b. AISC Certified Bridge Fabricator - Intermediate (IBR) OR c. AISC Certified Bridge Fabricator - Advanced (ABR) 2. AISC Fracture Critical Endorsement (FCE) a. AWS D1.5 Certified Welder (CW) Certification OR b. Certified Welding Fabricator (CWF) Certification 3. AWS Certified Welding Inspector a. AWS Certified Welding Inspector (CWI) Certification OR b. AWS Senior Certified Welding Inspector (SCWI) Certification 4. NDT Inspector a. ANSI/ASNT CP-189 NDT Level II OR b. ANSI/ASNT CP-189 NDT Level III 5. Professional Engineering License, Structural Engineer, with at least 10 years bridge design experience. The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Shoring, Special Foundations and Load-Bearing Elements, Driven Piles, Tunneling and Mining, Tunnel Excavation.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents