Similar Projects
University Boulevard Relocation - PWSTP43 - City of Harrisonburg
Infrastructure, Alteration
Conception
$8,501,222 est. value
Harrisonburg, VA 22801

Dogwood Culvert - PWSTBG11 - City of Harrisonburg
New Construction, Infrastructure
Conception
$600,000 est. value
Harrisonburg, VA 22801

Chicago Avenue Apartments
New Construction, Infrastructure
Design
$18,000,000 CJ est. value
Harrisonburg, VA 22802

AutoZone #1659 / Harrisonburg
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Harrisonburg, VA 22801

Three Springs WTP Third Well Project
Infrastructure
Bidding
$1,000,000 CJ est. value
McGaheysville, VA 22840

Cedar Street Culvert Replacement Project
Infrastructure
Bidding
$600,000 CJ est. value
Harrisonburg, VA 22801

Well Installation and Cistern Abandonment
Infrastructure
Sub-Bidding
$19,000 CJ est. value
Bridgewater, VA 22812

RFQ Contractor - Phlipott Landslide Construction
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bassett, VA 24055

RFQ Contractor - Phlipott Landslide Construction
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bassett, VA 24055

Multi-Use Trail Construction Projects
Infrastructure
Results
$400,000 CJ est. value
Hillsboro, VA 20132

Multi-Use Trail Construction Projects
Infrastructure
Results
$400,000 CJ est. value
Hillsboro, VA 20132

Vine Street Townhomes / Harrisonburg
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Harrisonburg, VA 22802

U.S. Route 33 Self-Storage Facility
New Construction, Infrastructure - 48,900 SF
Pending Verification
$6,000,000 CJ est. value
Penn Laird, VA 22846

Westover Skate Park Improvement Project - P&R 22-4 - City of Harrisonburg
Infrastructure
Conception
Harrisonburg, VA 22801

Runway Lighting Rehabilitation
Infrastructure
Bidding
$300,000 CJ est. value
Bridgewater, VA 22812

Last Updated 03/27/2023 03:13 PM
Project Title

Veronesi Holdings Production Center - Innovation Village

Physical Address View project details and contacts
City, State (County) Harrisonburg, VA 22802   (Harrisonburg City County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected January 2022
Bids Due View project details and contacts
Estimated Value $100,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 2, 2022, construction is well under way. The owner is based out of Italy and at this time does not have a USA office location. The building permit was issued by Rockingham County back in January 2022 and construction started that same month. Construction is anticipated to be finished by March 2023. Link to the Owner website: www.gruppoveronesi.it/ *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Manufacturing/Processing Plant, New Construction, 75.80 Acres.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents