Similar Projects
Annual Standby Emergency Pumping Contract
Term Contract
Bidding
Pine Knoll Shores, NC

Dutchman Creek Pump Station
Bidding
$471,000 est. value
Yadkin Valley, NC

Well House Repairs
Post-Bid
Santeetlah, NC

Ground Source Heating Pump, Fort Bragg NC.
Post-Bid
Fort Bragg, NC 28307

Domestic Water Booster Pump Installation
Results
Raleigh, NC

Y--Replace Potable Water Wells and Install Raw Water Main
Results
$1,000,000 to $5,000,000 est. value
Cherry Point, NC 28533

Replace Existing Raw Water Pump Project
Bidding
Kings Mountain, NC

Raw Water Wells
Post-Bid
Laurinburg, NC 28353

N--BIA Cherokee Agency_Heat Pump Replacement
Results
Less than $25,000 est. value
Cherokee, NC 28719

Contract III - 2020 USDA Well Building Improvements
Post-Bid
Red Springs, NC 28377

Grease Trap and Lift Station Pumping for Columbus Correctional
Term Contract
Results
Raleigh, NC

Monitoring Well Abandonment
Post-Bid
NC

Raw Water Intake Improvements
Results
Raleigh, NC

Raw Water Pump and Motor
Post-Bid
Camp Lejeune, NC

Sailfish Street Water Supply Well
Results
Currituck, NC

Last Updated 03/13/2020 02:00 PM
Project Title

Design-Build Delivery of the Cape Hatteras RO Wellfield Expansion

Physical Address View project details and contacts
City, State (County) Frisco, NC 27936   (Dare County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide final Design and Construction Services for the addition of four (4) 500-GPM production wells, 12,000 LF of brackish water main, 9,000 of fresh water main and all associated electrical equipment, controls, valving and pipeline appurtenances. provide a high level of service, the need for the installation of four new reverse osmosis production wells along with the associated well head equipment was identified. Each well has a target yield of 500 gallons per minute (gpm) and their preliminary locations are shown in the documents attached to this RFQ. In addition, to the new wells approximately 12,000 linear feet of brackish raw water main will be installed, and 9,000 linear feet of fresh raw water main will be replaced and connected to the existing nineteen shallow freshwater wells at the Cape Hatteras Water Treatment Facility located in Frisco, NC.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents