Similar Projects
Kroh Park (Phase II) - City of Loveland
New Construction, Infrastructure
Conception
$1,800,000 CJ est. value
Loveland, CO 80538

Fairgrounds Park (Phase II) - 20FITNESSCRT - City Of Loveland
Infrastructure
Conception
$1,715,000 CJ est. value
Loveland, CO 80537

Flats at Hansen Farm
New Construction, Infrastructure
Design
$40,000,000 CJ est. value
Fort Collins, CO 80528

Northern Integrated Supply Project and Glade Reservoir
Term Contract, New Construction, Infrastructure
Design
$1,100,000,000 CJ est. value
Fort Collins, CO 80521

Chiropteran Research Facility
New Construction, Infrastructure
Bidding
$999,999 CJ est. value
Fort Collins, CO 80521

Safe Water Action Program General Contractor
Infrastructure
Post-Bid
Fort Collins, CO

RFP Engineering - Bus Fueling Station Design and Install
Infrastructure
Post-Bid
$500,000 CJ est. value
Fort Collins, CO 80525

Parks and Recreation Irrigation Mainline Replacement
Infrastructure
Results
$272,275 CJ est. value
Loveland, CO 80537

US 36 Highway and Community Drive Roundabout
Infrastructure
Results
$2,987,737 CJ est. value
Estes Park, CO 80517

Berthoud Commons
New Construction
Construction
Berthoud, CO 80513

Thompson River Ranch Clubhouse - Phase I Site Improvements
Infrastructure
Construction
Johnstown, CO 80534

Worthington Storage
New Construction, Infrastructure - 85,200 SF
Pending Verification
$9,200,000 CJ est. value
Fort Collins, CO 80526

Balfour Senior Living Development
New Construction, Infrastructure - 250,000 SF
Pending Verification
$35,000,000 CJ est. value
Fort Collins, CO 80528

Fleet Garage Expansion - City Of Loveland
Addition, Demolition, Renovation, Infrastructure
Conception
$2,000,000 CJ est. value
Loveland, CO 80537

The Loveland Museum / Gallery Expansion - City of Loveland
Addition, Demolition, Build-out, Infrastructure - 46,500 SF
Design
$22,000,000 CJ est. value
Loveland, CO 80537

Last Updated 02/07/2023 10:27 AM
Project Title

Mountain Campus Wastewater Treatment Plant

Physical Address View project details and contacts
City, State (County) Bellvue, CO 80512   (Larimer County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected March 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $3,800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Questions are submitted online No Fort Collins, Colorado, final settlement will be made by the Board of Governors of the Colorado State University System acting by and through Colorado State University, a division of the State of Colorado with Integrated Water Services, Inc., 4001 N. Valley Dr., Longmont, CO 80504, hereinafter called the "CONTRACTOR", for and on account of the Contract for the construction of a PROJECT as referenced above.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents