Similar Projects
Pointe Fayetteville Apartments Phase A
New Construction, Infrastructure
Design
$159,000,000 est. value
Fayetteville, AR 72704

Veterans Health Care System of the Ozarks in Fayetteville, AR - Refurbish Oval of Circle Drive
Infrastructure
Bidding
$5,000,000 CJ est. value
Fayetteville, AR 72703

Veterans Health Care System of the Ozarks in Fayetteville, AR - Refurbish Oval of Circle Drive
Infrastructure
Bidding
$5,000,000 CJ est. value
Fayetteville, AR 72703

Seal Coating and Re-Striping of the Parking Lot at Arvest Ballpark
Infrastructure
Post-Bid
Springdale, AR 72762

ARWWA Miscellaneous Upgrades 2021
Infrastructure
Post-Bid
Farmington, AR

Prairie Grove and Siloam Springs Overlay
Results
Prairie Grove, Siloam Springs, AR

Richmond Road Surfacing
Infrastructure
Results
Farmington, AR 72730

Markham Cottages
New Construction, Infrastructure - 19,536 SF
Pending Verification
$5,000,000 CJ est. value
Fayetteville, AR 72701

Markham Cottages
New Construction, Infrastructure - 19,536 SF
Pending Verification
$5,000,000 CJ est. value
Fayetteville, AR 72701

Tontitown Fire Station
New Construction, Infrastructure
Bidding
$6,000,000 CJ est. value
Springdale, AR 72762

Viney Grove Road - Phase I improvements
Infrastructure
Post-Bid
Prairie Grove, AR 72753

Construction – 2021 Waterline Improvements
Infrastructure
Results
Less than $5,250,000 est. value
Fayetteville, AR

Ramsey Village Apartments
New Construction, Alteration
Pending Verification
$21,000,000 est. value
Fayetteville, AR 72704

Dunkin Donuts / Wedington
New Construction, Infrastructure - 2,063 SF
Bidding
$1,000,000 CJ est. value
Fayetteville, AR 72704

Construction of the Mission-Razorback Connector
Infrastructure
Post-Bid
Fayetteville, AR

Last Updated 08/04/2022 11:02 AM
Project Title

RFQ Construction Manager at Risk - Midtown Corridor

Physical Address View project details and contacts
City, State (County) Fayetteville, AR 72701   (Washington County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Fayetteville is accepting statements of qualifications from construction management firms properly licensed to provide construction management / general contractor (CM/GC) services as a construction management at risk (CMAR) / guaranteed maximum (GMP) project for the Midtown Corridor Project. The project includes storm drainage, trail, sidewalks, enhanced crosswalks, turn lanes, new traffic signals, street lighting and landscaping. The project will include up to three separate phases to include the following: (1) Deane Street - Fire Department to Garland Ave; (2) Sycamore Street from Garland Ave. to the Razorback Greenway and (3) Poplar Street from Razorback Greenway to N. Woodland Avenue Professional Services required include: 1. Ensure all funds are spent in accordance with State of Arkansas Procurement laws 2. Guaranteed maximum price construction 3. Estimating 4. Sub-contractor bidding 5. Project and change order pricing 6. Schedule control 7. Management of demolition and reconstruction 8. Cost reduction and control 9. Project coordination with the design engineer and the City of Fayetteville. 10. Project close out 11. Warranty All questions regarding the process should be directed to Andrea Foren at aforen@fayetteville-ar.gov. Statements of qualification submitted shall be qualified to do business and licensed in accordance with all applicable laws of the state and local governments where the project is located. Pursuant to Arkansas Code Annotated 22-9-203 The City of Fayetteville encourages all qualified small, minority and women business enterprises to bid on and receive contracts for goods, services, and construction. Also, City of Fayetteville encourages all general contractors to subcontract portions of their contract to qualified small, minority and women business enterprises. The City of Fayetteville reserves the right to reject any or all proposals and to waive irregularities therein, and all Proposers shall agree that such rejection shall be without liability on the part of the City of Fayetteville for any damage or claim brought by any Proposer because of such rejections, nor shall the Proposers seek any recourse of any kind against the City of Fayetteville because of such rejections. The filing of any Proposal in response to this invitation shall constitute an agreement of the Proposer to these conditions. Shortlist Confirmed.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation, Roadway Signaling and Control Equipment, Traffic Signals.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents