Similar Projects
North Shore Terminal Reservoir Phase 2 Expansion Project
Renovation
Design
Orem, UT

Kolob Canyons Water Tank & Distribution
Post-Bid
$1,000,000 to $5,000,000 est. value
New Harmony, UT 84757

Repair of Sewage Lift Pumps and Septic Tanks
Term Contract
Post-Bid
Price, UT

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

DFCM Construction-Standard Low Bid-Parks and Recreational Water Supply Improvements Gunlock Street Park-19326150
Results
Less than $180,000 est. value
Gunlock, UT 84733

Boulder Farmstead Water Company Water Tank
Post-Bid
Less than $510,000 est. value
Boulder, UT 84716

TLWID Water Improvements Project 2019
Results
Less than $850,000 est. value
Lapoint, UT 84039

Four (4) 1,000 Gallon Propane Tanks
Post-Bid
Blanding, UT 84511

Culinary Water Improvements for Elsinore Town
Results
Less than $2,000,000 est. value
Elsinore, UT 84111

Automated Brine Maker System With Vertical Storage Tanks
Post-Bid
Orem, UT 84057

Zone 2 Secondary Water Storage Reservoir
Results
Less than $1,000,000 est. value
Magna, UT 84044

Zone 1 Airport No. 2 4.0 MG Water Storage Reservoir
Post-Bid
West Jordan, UT

Cathodic Protection Services
Results
Sandy, UT

Reported 03/27/2020 12:00 AM
Project Title

Zone D - 5 Million Gallon Tank

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $5,000,000 to $6,000,000
Plans Available from Municipal Agency - 01/07/20
Owner View project details and contacts
Architect View project details and contacts
Description

The construction of a water-tight reinforced concrete structure with a 5.0-million-gallon capacity; valve vault with piping, valves, etc.; inlet/outlet piping; site work including grading, road base, and fencing. The project includes electrical connections to and electrical work associated with the valve vault and telemetry wiring for an RTU and a Security Camera System. There will be some electrically retrofit of the existing valve vault regarding lighting and ventilation. Piping shall include connections to existing systems.The preliminary budget estimate for the project is estimated to be in the range of $5.0 million and $6.0 million.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents