Citizens Bank
New Construction - 2,600 SF
Conception
$500,000 to $1,000,000 CJ est. value
Pittsburgh, PA 15206

Prickett Preserve at Edgewood - Master Plan
New Construction - 437,200 SF
Design
Yardley, PA 19067

First National Bank
New Construction, Renovation - 2,079 SF
Design
$1,500,000 est. value
Pittsburgh, PA

Multiple Santander Branch Refreshes
Renovation
Post-Bid

Multiple Santander Branch Refreshes
Renovation
Post-Bid

Critical Infrastructure
Build-Out
Results
Oil City, PA 16301

PNC Bank
Renovation - 4,125 SF
Construction
$478,000 est. value
Millersville, PA 17061

PNC Bank
Renovation
Construction
Hazleton, PA 18201

The Hub at Bensalem
New Construction - 193,350 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Bensalem, PA 19020

Peoples Security Bank and Trust Company
New Construction - 4,186 SF
Pending Verification
Doylestown, PA 18901

The Piazza at Former Star City Site - Building 7
New Construction - 2,500 SF
Design
$500,000 to $1,000,000 CJ est. value
Bridgeville, PA 15017

Fulton Bank
Renovation - 1,931 SF
Post-Bid
Philadelphia, PA 19147

Fulton Bank
New Construction - 3,224 SF
Construction
$1,000,000 est. value
Ephrata, PA 17522

Firstrust Bank
Renovation
Pending Verification
Conshohocken, PA 19428

JPMorgan Chase - East Liberty Branch / Pittsburgh
New Construction - 3,279 SF
Design
$800,000 to $2,000,000 est. value
Pittsburgh, PA 15206

Last Updated 08/08/2022 02:02 PM
Project Title

RFQ Contractor - INDE 245589, Rehabilitate the Interior and Exterior of First Bank, Independence

Physical Address View project details and contacts
City, State (County) Philadelphia, PA 19106   (Philadelphia County)
Category(s) Commercial
Sub-Category(s) Bank
Contracting Method Competitive Bids
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 8, 2022, this project is still in the market research stage. The solicitation for this project is not anticipated to go out before October of 2022. *The previous solicitation is listed below for reference This is a Sources Sought Notice (SSN) for the purpose of conducting market research. Proposals are NOT being requested nor accepted at this time. Responses are being requested from both large and small businesses. Purpose: The purpose of this notice is to gain knowledge regarding the type of interested businesses and their qualifications. The National Park Service (NPS) will use information obtained through this notice to develop an acquisition strategy. The Government anticipates conducting a competitive acquisition for this requirement. The amount of interest or lack thereof will determine the possibility of a small business or other socio-economical small business set aside for the solicitation. Analysis of the quality of responses to this source sought announcement will be considered in the market research being conducted and in the making of any small business set-aside determination for this requirement. Additional Information: No proposal package, solicitation, specification, or drawings are available with this notice. Cost Reimbursement: Response to this announcement is strictly voluntary; no reimbursement will be made for any costs associated with providing information in response to this sources sought announcement or any follow-up information requests. North American Industry Classification System (NAICS) code: 236220, Commercial and Institutional Building Construction Small Business Size Standard: $39.5 million Solicitation: The NPS anticipates issuing a request for proposals in the late summer or early fall of 2022. Bonding: The NPS anticipates bid, performance and payment bonds will be required Project Description: The project is located at the Independence National Historical Park, Philadelphia, PA. The construction magnitude is greater than $10,000,000. The surrounding area is urban with designated staging located at the bank. The construction site is within 10 of miles from nearest suppliers and lodging facilities. The building will be closed during construction. The site requires protective measures to ensure the surrounding area remains undisturbed. The structure is a historic resource; therefore, historic preservation experience will be required. All work shall follow the Secretary of Interior's Standards for the Treatment of Historic Properties. The project involves demolition and hazardous materials abatement/removal. The anticipated period of performance of 610 calendar days including any potential weather shutdown. Winter construction may be required. The project will be constructed under a single prime contract. Project Scope: This project will restore the interior and exterior of the First Bank of United States, allowing the building to reopen to public visitation. The rehabilitated building will house new exhibits related to the American financial system, its history and impacts. The project will replace a failed and leaking copper standing seam roof, correcting longstanding interior moisture incursion problems and mitigating damage to the interior walls. The exterior marble and brick masonry will be stabilized, cleaned, and repaired to be made safe for staff and visitors. The cornice will be repaired to secure loose elements. The failed HVAC system will be replaced with a new heating, ventilation, and air conditioning system connected to the park's existing coolant loop and building control systems. The intrusion and fire detection systems will include remote monitoring to allow law enforcement to better assess alarms and notifications before dispatching personnel. The rehabilitated building will also be made more accessible for visitors and employees with disabilities. Interior renovations will also include replacing an elevator and reconfiguring restrooms for accessibility, updating the electrical system to the current electrical code for the increased electrical demand, and installing a fire suppression system. An addition to the building will relocate core elements to the exterior of the historic envelope. These elements include a new staircase, an elevator with doors that open at 90 degrees to each other, and restrooms. The existing staircase will be improved to meet fire safety and egress requirements. The interior finishes will be repaired and rehabilitated. Submittal Contents: Interested (small and large) businesses should submit the following information: (1) Company name, DUNS number, SAM Unique Entity ID, address, point of contact, telephone number, and email address. (2) Business type: Classification as a Large or Small Business under the above listed NAICS, Small Business Administration (SBA) certified Historically Underutilized Business Zone (HUBZone), Veteran-Owned Small Businesses (VOSB), Service-Disabled Veteran-Owned Small Businesses (SDVOSB), SBA certified Woman Owned Small Business (WOSB), Economically Disadvantaged Woman Owned Small Business (EDWOSB). The size of a small business firm includes all parents, subsidiaries, affiliates, etc.--see 13 CFR 121.108.) Misrepresentation of size status can result in penalties. (3) Statement regarding your company's bonding capacity. Letters from bonding companies are not required at this time. (4) Information demonstrating experience and capability as a prime contractor coordinating multiple subcontractors on projects of same or similar size, scope and magnitude, and constructed under similar conditions. Experience should include historic preservation as well as experience in urban settings and on Federal property. a. Include information for each of the anticipated subcontractors. (5) In addition, businesses may submit existing marketing materials such as capability statements and brochures. Submittal Due Date/Time: 1700 E.D. April 25, 2022 Submit To: michael_moffett@nps.gov (Contract Specialist) and jeffery_hepp@nps.gov (Contracting Officer) The method of contractor selection has not been determined at this time.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Special Function Doors, Entrances and Storefronts, Windows, Special Function Hardware, Special Function Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Emergency Access and Information Cabinets, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Security Mirrors and Domes.
Division 11 - Equipment, Security, Detention, and Banking Equipment, Vault Equipment, Safe Deposit Boxes, Safes, Vault Ventilators, Teller and Service Equipment.
Division 12 - Furnishings, Art, Window Treatments, Specialty Casework, Bank Casework, Furniture, Office Furniture.
Division 13 - Special Construction, Vaults, Security Vaults.
Division 14 - Conveying Equipment, Pneumatic Tube Systems.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs, Gutters, Sidewalks, and Driveways, Curbs and Gutters, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents