Similar Projects
Installation of Air Conditioning and Electrical Improvements at Firehouse 2
Alteration
Bidding
$30,000 est. value
Bristol, CT 06010

Full or Partial Replacement of HVAC System
Renovation
Bidding
$350,000 est. value
Rocky Hill, CT

HVAC and Mechanical Products
Term Contract
Post-Bid

B Building Exhaust Noise Reduction
Post-Bid
Farmington, CT

Avon Free Public Library Replacement of Geothermal System
Results
Avon, CT 06001

High School Complete Commercial Pool Heater Replacement and Piping
Results
Plainville, CT

Classroom Indoor Air Quality Improvements Project
Alteration
Bidding
$200,000 est. value
Hartford, CT

Design-Build Services for the Carl E. Allgrove Elementary School Air Conditioning Project
Post-Bid
East Granby, CT 06026

Sage Park Middle School Energy and Efficiency HVAC Upgrades
Results
Windsor, CT 06095

J045--VISN 1 - Pipe-Steam Fitting 5-Year Pop Agreement
Post-Bid
Newington, West Hartford, West Haven, CT - Bedford, Boston, Brockton, Northampton, MA - Augusta, ME 06516

Replacement of Rooftop Heating/Cooling Units at Manchester High School
Results
Manchester, CT 06040

Cleaning and Degreasing of Kitchen Exhaust Systems
Post-Bid
New Britain, CT

Replacement of the Daiken VRF System at Illing Middle School
Results
Manchester, CT 06040

045--Chilled Water Line Repair
Post-Bid
West Haven, CT 06516

HVAC System Maintenance Services for CCSU
Results
New Britain, CT

Last Updated 06/17/2022 03:19 AM
Project Title

Music Room Air Handling Unit Replacement at Sedgwick Middle School

Physical Address View project details and contacts
City, State (County) West Hartford, CT 06107   (Hartford County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will involve the removal of existing air handling unit and its associated condenser and installation ofnew units as per plans. It is located at the Sedgwick Middle School, 128 Sedgwick Road, West Hartford, 06107. Work must be coordinated with the occupant's as not to interfere with their normal business routine. To accommodate this project hours of works will be available from 7:00 AM to 11 :00 PM and Saturday and Sunday if needed but will need to adhere to the Town's noise ordinance. The work area must be kept cleaned, free of hazards and protected at all times. Substantial completion by November 15, 2022 and final completion must be achieved by November 30, 2022. All Bidders must file with their bid a bid bond, certified or treasurer's check in the amount of 10% of the total of the base bid made payable to the Town of West Hartford. Performance and Labor and Material Payment bonds in the amount of 100 3/4 of the contract price will be required of the successful bidder if the contract pursuant to this request for bids exceeds $50,000.00. If you have questions regarding electronic submission, please do not hesitate to contact Tammy Bradley via email at tammyb@westhartfordct.gov. No bid may be withdrawn for a period of ninety (90) days after the opening of bids without the approval and written consent of the Town of West Hartford. The right is reserved to reject any and all bids, to waive any informalities in the bidding and to make awards in any manner that is the most beneficial to the Town.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents