Similar Projects
I-80, Utica - Lincoln
Infrastructure
Post-Bid

RFP Construction Management at Risk - Seward Wellness Center
New Construction, Infrastructure - 61,000 SF
Post-Bid
$18,000,000 CJ est. value
Seward, NE 68434

Bridges, General (All Classes)
Infrastructure
Results
$3,029,011 CJ est. value
Goehner, NE 68434

Bridges, General (All Classes)
Infrastructure
Results
$3,029,011 CJ est. value
Goehner, NE 68434

Bituminous - I-80
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Milford, NE 68405

East Seward Street Improvements
Infrastructure
Post-Bid
$1,921,462 CJ est. value
Seward, NE 68434

Parking Lot Pavement
Infrastructure
Post-Bid
$659,000 CJ est. value
Seward, NE 68434

Secondary Wastewater Main
Infrastructure
Post-Bid
$500,000 CJ est. value
Utica, NE 68456

Bradford Street Storm Sewer Improvements
Infrastructure
Post-Bid
$450,000 CJ est. value
Seward, NE 68434

County Sheriff Office Expansion
Addition, Infrastructure
Post-Bid
$560,000 CJ est. value
Milford, NE 68405

Last Updated 04/20/2023 11:03 PM
Project Title

500,000 Gallon Water Tower

Physical Address View project details and contacts
City, State (County) Seward, NE 68434   (Seward County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $3,187,600 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of January 6, 2023, this project will rebid. No definite date yet but it would be sometime second or third week of January 2023 ** Pre-Bid Meeting Info: None required. No Bids Received. Project shall consist of the construction of a 500,000-gallon elevated spheroid style water storage tank, all associated piping, valves, site grading, sodding, electrical, storm sewer modifications, paving improvements, demolition of the existing 200,000-gallon tank, controls, testing and disinfection, and all other miscellaneous items of construction indicated in the plans and specifications. Project shall consist of construction of a 500,000-gallon elevated spheroid steel water storage tank. 1. Bid Section I-500,000-gallon Elevated Water Storage Tank Work shall include all excavation, water main construction within five feet of the tank foundation, a prefabricated altitude valve skid structure by EFI or equal, pipe bedding, backfilling, grading, compaction, concrete foundation, erection of tank (including production of tank and foundation drawings by a State of Nebraska Registered Professional Engineer), purchase and installation of an automatic tank mixer, tank and piping disinfection and placement into service, tank painting (with the Base Bid to include a full-color logo as depicted in Appendix "C" of these specifications, internal tank lighting, tank overflow, obstruction and site lighting, tank electrical service and related equipment, site grading and coordination with sprinkler/sod installers, installation of communications duct banks, and all other incidental work for a complete and operational water storage tank as shown on the plans and described further in these Specifications. The bid item shall be on a Lump Sum basis. 2. Bid Section II-Miscellaneous Utility Work: Work shall consist of all excavation, installation of water mains,storm sewer and related work, bedding, backfilling, grading, valves, hydrants, disinfection and testing of new water mains, connections to existing water mains, fittings, pavement/sidewalk removal, seeding, sodding, and landscaping the site, installation of sprinkler system, special inspections and testing services, and all other incidental work as further described in the plans and in these specifications. The bid item shall be on a Unit Price basis. 3. Bid Section III-Existing Tank Demolition: Work shall consist of isolating the existing Seward 200,000-gallon multilegged elevated water tower from the system, demolishing and removing the tank, existing altitude valve and structure and other miscellaneous items identified on the plans,site restoration, abandonment of onsite water mains and all other items as shown in the plans and described in the Specifications. The Bid Section shall be on a Lump Sum Basis

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents