Similar Projects
Courthouse Infrastructure Improvement
Renovation - 1,100 SF
Post-Bid
Mount Vernon, IL 62864

Elevator Modernization in the County Courthouse
Renovation
Post-Bid
Marion, IL 62959

Mchenry County Government Center Third Floor Courtrooms Renovation
Renovation
Results
Woodstock, IL 60098

Us Customhouse 10th Floor DHS OIG
- 8,400 SF
Results
$1,000,000 to $5,000,000 est. value
Chicago, IL 60607

CDH Winfield Town Center Planned Unit Development
New Construction - 23,800 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Winfield, IL 60190

Village Hall Training Room
Build-Out
Post-Bid
Carol Stream, IL 60188

Franklin County Courthouse
New Construction - 44,075 SF
Results
Benton, IL 62812

Window Treatments for City Hall Windows
Alteration
Post-Bid
Quincy, IL 62301

Cary Municipal Center
New Construction
Results
Cary, IL 60013

Repair of Existing Wood Columns in City Hall Plaza
Infrastructure
Post-Bid
Quincy, IL 62301

Village Hall Office Renovation
Renovation
Results
Less than $40,000 est. value
Western Springs, IL 60558

Gallatin County Courthouse Proposal
Renovation
Post-Bid
Shawneetown, IL

Lobby Renovation of Morton Village Hall
Renovation - 350 SF
Results
Morton, IL 61550

Government Center Remodel
Renovation
Post-Bid
Bloomington, IL 61701

Renovate Building Interior and Exterior (General)
Renovation
Results
Less than $700,000 est. value
Mount Vernon, IL 62864

Last Updated 10/04/2021 05:02 PM
Project Title

DNR-Frank Holten Kitchen And Banquet Areas Remodel

Physical Address View project details and contacts
City, State (County) East Saint Louis, IL 62205   (Saint Clair County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remodel clubhouse and equipment installation. All appliances, prep tables and other equipment have been removed from the kitchen and will need to be replaced with new industrial grade equipment. The restrooms, banquet area and exterior are all in need of improvements. New kitchen equipment shall also be provided and installed in the remodel. The clubhouse kitchen is approximately 570 sq. ft, and the banquet room is approximately 4500 sq. ft. The existing wiring in the kitchen is a 3-phase system. Occupancy load for this building is 243.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents