Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Electrician Services
Term Contract
Bidding
Lufkin, TX

HVAC Repairs and Maintenance
Term Contract
Post-Bid
Pollok, TX 75915

5D4m-Replace Hospital Power Lines
Post-Bid
$25,000 to $100,000 est. value

Freezer System Replacement Lufkin State Supported Living Center
Results
$115,000 est. value
Pollok, TX 75969

DPS Lufkin HVAC Replacement
Results
Less than $36,213 est. value
Lufkin, TX 75904

HVAC and Mechanical Products
Term Contract
Post-Bid

Generator Upgrade, Lufkin DHQ
Results
Less than $362,800 est. value
Lufkin, TX 75901

Transformer Testing and Maintenance on Switching Blades
Post-Bid
Falcon Heights, TX

Building Automation System (BAS) Replacement - North Texas Region
Results
$1,791,763 est. value
Abilene, Mexia, Pollok, Rusk, Wichita Falls, TX 75969

Facility A/C Bacnet Repair
Post-Bid

Water Plant No. 3 Electrical Generator
Results
$375,000 est. value
Lufkin, TX 75902

Exhaust Hood & Duct Cleaning - 2 Month Service
Post-Bid
San Antonio, TX 78275

Emergency Chiller Replacement, Lufkin State Supported Living Center
Results
$440,000 est. value
TX 75969

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Reported 01/06/2022 12:00 AM
Project Title

Design Build Services for Energy Efficiency and Facility Improvement

Physical Address View project details and contacts
City, State (County) Lufkin, TX   (Angelina County)
Category(s) Single Trades
Sub-Category(s) Electric, HVAC
Contracting Method Design-Build. Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Owner intends to enter into an agreement with a Design Build firm to implement energy efficiency and deferred maintenance improvements at facilities throughout the district. The Respondent, upon selection, will provide a Total Project Lump Sum Price for the project that is developed for the Owner. The Owner will evaluate the use of the most appropriate source of funding for the project. 1. DX HVAC equipment/replacements 2. LED Lighting Retrofits 3. Building Controls Upgrades for HVAC equipment.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Packaged Generator Assemblies, Wind Energy Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents