Similar Projects
Calesa - Master Plan
New Construction
Conception
Ocala, FL

Millwood Estates
New Construction
Design
Ocala, FL

Rehabilitation of Residential Home
Post-Bid
Ocala, FL 34475

Sources Sought Notice for Bureau of Indian Affairs (BIA) Demolition Indefinite
Demolition
Post-Bid
$25,000 to $200,000,000 est. value

Abare Ship Rehabilitation
Results
Summerfield, FL 34491

Larocco Ship Rehabilitation
Results
Less than $36,000 est. value
Ocala, FL 34479

World Equestrian Center
New Construction - 140,000 SF
Construction
$10,000,000 CJ est. value
Ocala, FL 34482

Harper/Adkins Residence
New Construction - 3,776 SF
Construction
$240,000 est. value
Salt Springs, FL 32134

Johnson Ship Rehabilitation
Results
Ocala, FL 34482

Curl Ship Rehabilitation
Results
Less than $9,000 est. value
Ocala, FL 34471

Rehabilitation of Residential Home
Results
Ocala, FL 34475

Rehabilitation of Residential Home
Results
Ocala, FL 34474

Rexrode Ship Rehabilitation
Results
Ocala, FL 34481

WRF Site #1, Demolition Phase 1
Results
Ocala, FL 34475

Demolition and Removal of Structure - 446 Northwest 9th Avenue
Demolition
Results
Ocala, FL 34471

Last Updated 09/25/2020 10:11 AM
Project Title

Demolish Residence at 10860 SE 52nd Court

Physical Address View project details and contacts
City, State (County) Belleview, FL 34420   (Marion County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Demolition, Single-Family Homes
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The completed demolition, removal of the structure and all contents, driveway, grading and grass seeding of all disturbed areas: The Project consists of: • The removal and disposal of all contents within the structure, including the proper removal and disposal of the Freon in the existing A/C system. • The removal and disposal of the existing concrete block structure made up of: - 1688 SF of enclosed area comprised of the residence and an enclosed garage - 200 SF open back patio - 128 SF open front stoop - 1007 sf of concrete driveway. • City utilities (water and sewer) have been disconnected at the road right of way, contractor shall be responsible for the removal of the piping from the road right of way to the structure. • Contractor shall be responsible for notifying other utilities (i.e. power, telephone, internet, gas) regarding the pending demolition of the building and having such utilities disconnected and removed from the property. • Contractor shall be required to provide proof that disposal site is properly permitted through the State of Florida to accept the demolition material.

Details

1 Single-Family Homes, 3,023 SF Demolition.
Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents