Similar Projects
West Howard St Br (Tpk Bond)
Demolition, New Construction, Infrastructure
Design
$1,600,000 CJ est. value
Welch, WV 24801

West Howard St Br (Tpk Bond)
Demolition, New Construction, Infrastructure
Design
$1,600,000 CJ est. value
Welch, WV 24801

Pavement Markings Roadway Striping District Wide
Infrastructure
Sub-Bidding
$2,348,000 CJ est. value
Coalwood, WV 24828

Dollar General / Paynesville
New Construction, Infrastructure - 10,640 SF
Post-Bid
$2,000,000 CJ est. value
Paynesville, WV 24873

Dollar General / Paynesville
New Construction, Infrastructure - 10,640 SF
Post-Bid
$2,000,000 CJ est. value
Paynesville, WV 24873

Kimball Slab Bridge
New Construction, Infrastructure
Results
WV

Big Creek Arch
New Construction, Infrastructure
Results
WV

Clear Fork Arch No 3
Demolition, New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Northfork, WV 24868

Stevens Correctional Center - Foundation Repair
Infrastructure
Post-Bid
$175,000 CJ est. value
Welch, WV 24801

Superior Bridge
New Construction, Infrastructure
Results
WV

Big Four - Kimball Rd
Infrastructure
Design
$900,000 CJ est. value
Welch, WV 24801

Bridge Expansion Joint Repair System Emseal 6622C008
Renovation, Infrastructure
Results

Bridge Expansion Joint Repair System Silspec 6622C019
Renovation, Infrastructure
Results

Deep Injection Roadway Settlement Stabilization
Infrastructure
Results

2022 RPM
Infrastructure
Results

Last Updated 03/23/2023 03:35 AM
Project Title

Northfork Arch Br (TPK Bond)

Physical Address View project details and contacts
City, State (County) Coalwood, WV 24828   (McDowell County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,695,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Federal Project Number : NFA2717017 Type of Work : Replace Bridge As of March 23, 2023, the project is in Final Planning status. The funding obligation date for the construction is June 28, 2023. WVDOT - Northfork Arch Br (TPK Bond) *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents