Reported | 04/19/2022 12:00 AM |
Project Title | USACE Levee Repair |
Physical Address | View project details and contacts |
City, State (County) | San Joaquin, CA (San Joaquin County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Design-Build. Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | $5,000,000 to $10,000,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Design-bid-build construction requirement to repair 3,800 feet of through and under seepage to rehabilitate the San Joaquin levee in San Joaquin County to pre-flood conditions, due to flood damage in the winter of 2016-2017. The work site, referred to as 1151-21, is located along the San Joaquin River, against the Airport way bridge and extends South along the existing levee alignment. Construction is anticipated to include removal of the existing emergency berm and steel tube barrier fence, and the clearing, stripping and grubbing of existing vegetation to construct a seepage berm on the landside. Materials required for the seepage berm construction may include levee fill, geotextile, filter sand, drain rock, rip rap, seeding, aggregate surfacing, and steel tube barrier fence that match the existing materials. Project Description: The Government anticipates a design-bid-build construction requirement to repair 1,500 feet of through and under seepage to rehabilitate the San Joaquin levee in San Joaquin County to pre-flood conditions, due to flood damage in the winter of 2016-2017. The work site, referred to as 1151-21, is located along the San Joaquin River, south of Airport Way. Construction is anticipated to include removal an existing steel tube fence, clearing, stripping and grubbing of existing vegetation to construct a seepage berm on the landside of the levee. Materials required for the seepage berm construction may include levee fill, geotextile, filter sand, drain rock, rip rap, seeding, aggregate surfacing, and steel tube barrier fence that match the existing materials. The project is also anticipated to require dust control measures, morning safety meetings, weekly status and progress meetings. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |