Similar Projects
Oak Harbor Intermediate School
New Construction, Renovation
Conception
Oak Harbor, WA 98277

White River High School
Renovation
Conception
$4,178,000 est. value
Buckley, WA

New Transition Services Educational Facility
New Construction - 20,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Bellevue, WA

High School Addition
New Construction - 22,500 SF
Design
Ridgefield, WA

Lindbergh High School Modernization and Additions Bid Package- 4.1, 6.1, 7.1, 7.2, 8.1, 9.1-5, 32.2
Renovation, Addition
Bidding
$5,641,697 est. value
Renton, WA 98058

Lindbergh High School Modernization and Additions BP- 8.2, 10.1
Renovation, Addition
Bidding
$1,642,000 est. value
Renton, WA 98058

ESD 112 Mental Health Center
Renovation
Post-Bid
$1,800,000 est. value
Vancouver, WA 98661

Avanti High School and Annex Remodel
Renovation
Post-Bid
Olympia, WA 98501

Fire Alarm Maintenance And Repair Service
Renovation, Alteration
Results
Vancouver, WA 98686

Design-Build Services Tacoma Online Learning - Tenant Improvements
Renovation - 12,961 SF
Results
$5,000,000 est. value
Tacoma, WA 98402

Capital Projects Bond
Renovation, Addition
Conception
Bothell, WA

Cornerstone Christian Academy Middle/High School
Renovation
Design
Battle Ground, WA 98604

New Market Skills Center (NMSC) 2022 Cosmetology
New Construction
Bidding
$185,000 est. value
Tumwater, WA 98501

District Maintenance Building Improvements
New Construction
Post-Bid
$2,350,000 est. value
Steilacoom, WA

Architectural Services for High School Addition
New Construction, Addition - 15,000 SF
Results
Ridgefield, WA 98642

Last Updated 07/04/2022 12:08 AM
Project Title

North Thurston Public Schools River Ridge High School Modernization and Additions - Part 2

Physical Address View project details and contacts
City, State (County) Olympia, WA 98513   (Thurston County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $30,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Offsite and onsite utilities. 2. Demolition (of approximately 101,000 sf) and hazardous materials removal. 3. Modernization (of approximately 80,000 sf) and new construction (of approximately 121,000 sf). 4. Site work and sports fields. 5. Site preparation and utility connection for portable classroom campus. Work includes but is not limited to: 1. Demolition and hazardous materials removal. 2. Concrete and steel structure systems. 3. Exterior enclosure systems including: asphalt shingles, metal roof panels, metal wall and soffit panels, fiber-cement siding, polyvinyl chloride (PVC) roofing and associated sheet metal flashing and trim, and roof accessories. 4. Interior improvements including: wall, floor and ceiling finishes. 5. Food service equipment and conveyance systems. 6. HVAC, plumbing and fire protection systems. 7. Power and low' voltage systems. 8. Civil, landscape and irrigation including: earthwork, exterior improvements, and utilities. Work is to be performed in 3 primary phases over 58 months 1. Each phase includes subphases. 2. Each of the three phases shall be substantially complete prior to commencing the next one. Project involves but not limited to: 1. Complex phasing and transitions between phasing. 2. Temporary facilities including but not limited to: a. Utilities. b. Safety and security measures including cameras and fencing. c. Exiting pathways and tunnels and wayfinding signage. 3. Ongoing maintenance and operation of temporary facilities. 4. Work on an occupied site around students, staff and visitors. 5. Need to secure long lead items promptly in order to prevent delaying work.

Details

201,000 SF - Middle/Senior High School, Addition, Approximately 80,000 SF Renovation, Approximately 121,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents