Project Title | North Thurston Public Schools River Ridge High School Modernization and Additions - Part 2 |
Physical Address | View project details and contacts |
City, State (County) | Olympia, WA 98513 (Thurston County) |
Category(s) | Education |
Sub-Category(s) | Middle/Senior High School |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $30,000,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. Offsite and onsite utilities. 2. Demolition (of approximately 101,000 sf) and hazardous materials removal. 3. Modernization (of approximately 80,000 sf) and new construction (of approximately 121,000 sf). 4. Site work and sports fields. 5. Site preparation and utility connection for portable classroom campus. Work includes but is not limited to: 1. Demolition and hazardous materials removal. 2. Concrete and steel structure systems. 3. Exterior enclosure systems including: asphalt shingles, metal roof panels, metal wall and soffit panels, fiber-cement siding, polyvinyl chloride (PVC) roofing and associated sheet metal flashing and trim, and roof accessories. 4. Interior improvements including: wall, floor and ceiling finishes. 5. Food service equipment and conveyance systems. 6. HVAC, plumbing and fire protection systems. 7. Power and low' voltage systems. 8. Civil, landscape and irrigation including: earthwork, exterior improvements, and utilities. Work is to be performed in 3 primary phases over 58 months 1. Each phase includes subphases. 2. Each of the three phases shall be substantially complete prior to commencing the next one. Project involves but not limited to: 1. Complex phasing and transitions between phasing. 2. Temporary facilities including but not limited to: a. Utilities. b. Safety and security measures including cameras and fencing. c. Exiting pathways and tunnels and wayfinding signage. 3. Ongoing maintenance and operation of temporary facilities. 4. Work on an occupied site around students, staff and visitors. 5. Need to secure long lead items promptly in order to prevent delaying work. |
||||||||||||||||||||||||
Details | 201,000 SF - Middle/Senior High School, Addition, Approximately 80,000 SF Renovation, Approximately 121,000 SF New Construction.
|
||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |