Similar Projects
Hobe Sound Mixed Use
New Construction, Build-Out - 2,880 SF
Conception
Hobe Sound, FL 33455

96th Street Retail Plaza
New Construction - 10,400 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Stuart, FL 34997

The Altis
New Construction, Build-Out - 12,508 SF
Design
$1,131,000 est. value
Hobe Sound, FL 33455

Tractor Supply
New Construction - 40,000 SF
Design
$1,000,000 est. value
Palm City, FL 34990

The Reserve at Jensen Beach
New Construction
Post-Bid
$21,250,000 est. value
Jensen Beach, FL 34957

Walmart Supercenter #1087-602 - Capxhvac-2
Renovation
Post-Bid
Stuart, FL

Riverhouse Stuart
New Construction, Build-Out - 71,025 SF
Construction
$7,297,950 est. value
Stuart, FL 34994

Riverhouse Stuart
New Construction, Build-Out - 71,025 SF
Construction
$7,297,950 est. value
Stuart, FL 34994

Meridian Marina
Renovation, Addition - 62,000 SF
Pending Verification
Palm City, FL 34990

Hidden Key Apartments
New Construction - 19,978 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Stuart, FL 34994

Costco
New Construction - 157,531 SF
Design
$10,000,000 CJ est. value
Stuart, FL 34994

Walmart 0-2--TENANTBID--2021 - Bundle #2
Renovation
Post-Bid

The Sovana at Stuart
New Construction - 228,581 SF
Construction
$47,800,000 est. value
Stuart, FL 34994

Enterprise Rent-A-Car
New Construction
Conception
Stuart, FL 34997

River North
New Construction - 449,720 SF
Design
$10,000,000 CJ est. value
Stuart, FL 34994

Last Updated 03/03/2022 12:00 AM
Project Title

Kanner Highway Mixed Use - Master Plan

Physical Address View project details and contacts
City, State (County) Stuart, FL 34994   (Martin County)
Category(s) Commercial, Residential
Sub-Category(s) Apartments/Condominiums, Food/Beverage Service, Gas Station, Retail, Shopping Center/Strip Mall
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest, Construction Start Expected fourth quarter 2022, Construction Completion Expected fourth quarter 2028
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000 [brand] Estimate
Plans Available from Construction Manager as Agent (CMa)
Owner View project details and contacts
Architect View project details and contacts
Description

Mixed Use. Total sq ft for project not available at this time. Phase IA to include Costco Warehouse, Fuel Station, Site Development and Roadwork, 29.73 acres. Phase IB to include 398 multi-family units, 177,730 sf, 14.51 acres. Phase IC to include 19,250 square feet for retail shopping center, 16,240 square feet for restaurants, and 2,500 square feet for fast food with a drive thru, 4.74 acres.

Details

373,251 SF - 1 Retail, 1 Story Above Grade, 157,531 SF New Construction, 1 Gas Station, 1 Story Above Grade, New Construction 9 Fuel Pump(s), Food/Beverage Service, 1 Story Above Grade, 16,240 SF New Construction, 1 Shopping Center/Strip Mall, 1 Story Above Grade, 19,250 SF New Construction, Apartments/Condominiums, 4 Stories Above Grade, 177,730 SF New Construction, 398 Unit(s), 1 Food/Beverage Service, 1 Story Above Grade, 2,500 SF New Construction 1 Drive-thru, 49 Acres.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Specialty Doors and Frames, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment, Refrigerated Display Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Liquid Fuel Distribution, Gasoline Distribution, Gasoline Piping, Gasoline Pumps, Diesel Fuel Distribution, Diesel Fuel Piping, Diesel Fuel Pumps, Fuel-Storage Tanks, Underground Fuel-Storage Tanks, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents