Last Updated | 04/09/2020 10:43 AM |
Project Title | Henderson Street Substation |
Physical Address | View project details and contacts |
City, State (County) | Jersey City, NJ 07030 (Hudson County) |
Category(s) | Industrial/Manufacturing |
Sub-Category(s) | Electric Substation |
Contracting Method | |
Project Status | Construction Commenced April 2019, Construction Completion Expected June 2021 |
Bids Due | View project details and contacts |
Estimated Value | $15,000,001 to $20,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The proposed Henderson Street Substation shall be constructed at the southeast corner of the Hoboken Terminal/Yard complex, between the adjacent Pullman Yard area and Hudson-Bergen Light Rail System right-of-way on the site of the vacant former boiler building, and located in the City of Jersey City, County of Hudson, in the State of New Jersey. The Work of this Project consists of the construction of a new double-ended indoor secondary unit substation with primary switchgear, transformers and medium voltage drawout vacuum circuit breakers installed in metal clad switchgear and arranged in a main-double tie-main (main bus/tie bus/main bus) configuration to accommodate future additional power source connections which are planned. The substation is configured to initially operate via a temporary 13.2 kV service feed, but shall be constructed with provision for connection of future 26.4 kV service feed whose installation is pending construction of other improvements to support that service. Provision has also been made to support the future connection of a separate 13.2 kV micro-grid power source. The Project also includes the construction of multiple on-site stationary diesel engine drive electrical generators to provide standby power to the Hoboken Terminal/Yard complex via the Henderson Street Substation. The existing Henderson Street Substation must remain in continuous operation throughout the project, and the new substation must be installed,tested and energized prior to disconnecting and transferring any loads from the existing equipment to the new substation. The new substation will be located on the current site of the former boiler building, which is to be demolished as part of this Contract. The Project includes all other demolition, architectural, structural, geotechnical, electrical, HVAC, fire protection, and plumbing work specified on the contract drawings and specifications. |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |