Similar Projects
Replacement of Existing Substation No. 8 & Replacement of Existing Substation No. 14
Construction
$70,000,000 to $90,000,000 est. value
Harrison, Kearny, NJ

Substation Upgrades on Main Campus
Results
Galloway, NJ

Preventative Maintenance of Electrical Sub-Station Distribution Equipment at Broadway Terminial of the South Jersey Port Corporation
Post-Bid
Camden, NJ 08104

Red Bank Transmission Line
New Construction
Pending Verification
Middletown, NJ

PSE&G Lawnside Substation Addition
Addition
Conception
$1,000,000 to $5,000,000 CJ est. value
Lawnside, NJ 08045

PSE&G Texas Avenue Substation Addition
Addition
Design
Lawrence Township, NJ 08648

Cape May Substation Reliability Project
New Construction, Demolition
Design
$35,000,000 est. value
Cape May, NJ 08204

Washington/Gloucester Reliability Project
New Construction
Design
NJ 08080

Last Updated 04/09/2020 10:43 AM
Project Title

Henderson Street Substation

Physical Address View project details and contacts
City, State (County) Jersey City, NJ 07030   (Hudson County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Electric Substation
Contracting Method
Project Status Construction Commenced April 2019, Construction Completion Expected June 2021
Bids Due View project details and contacts
Estimated Value $15,000,001 to $20,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed Henderson Street Substation shall be constructed at the southeast corner of the Hoboken Terminal/Yard complex, between the adjacent Pullman Yard area and Hudson-Bergen Light Rail System right-of-way on the site of the vacant former boiler building, and located in the City of Jersey City, County of Hudson, in the State of New Jersey. The Work of this Project consists of the construction of a new double-ended indoor secondary unit substation with primary switchgear, transformers and medium voltage drawout vacuum circuit breakers installed in metal clad switchgear and arranged in a main-double tie-main (main bus/tie bus/main bus) configuration to accommodate future additional power source connections which are planned. The substation is configured to initially operate via a temporary 13.2 kV service feed, but shall be constructed with provision for connection of future 26.4 kV service feed whose installation is pending construction of other improvements to support that service. Provision has also been made to support the future connection of a separate 13.2 kV micro-grid power source. The Project also includes the construction of multiple on-site stationary diesel engine drive electrical generators to provide standby power to the Hoboken Terminal/Yard complex via the Henderson Street Substation. The existing Henderson Street Substation must remain in continuous operation throughout the project, and the new substation must be installed,tested and energized prior to disconnecting and transferring any loads from the existing equipment to the new substation. The new substation will be located on the current site of the former boiler building, which is to be demolished as part of this Contract. The Project includes all other demolition, architectural, structural, geotechnical, electrical, HVAC, fire protection, and plumbing work specified on the contract drawings and specifications.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Power Distribution Units, Transfer Switches.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents