Last Updated 09/26/2022 04:43 PM
Project Title

TSA Recapitalization and BHS Modernization

Physical Address View project details and contacts
City, State (County) Denver, CO 80249   (Denver County)
Category(s) Single Trades
Sub-Category(s) Security/Communications
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

https://www.star-telegram.com/news/politics-government/national-politics/article263241783.html The largest of the Federal Aviation Administration grants include $60 million to improve the terminal and replace the bag-handling system at Denver International Airport, $50 million apiece for Boston's Logan Airport and Orlando International Airport in Florida, $49.6 million for Dulles Airport outside Washington, D.C., to build a new concourse and $20 million for Pittsburgh International Airport to build a new terminal next to the old one. _____________________________________________________________________________________________________________________________ This request is for a competitive procurement to select a qualified contractor for the Transportation Security Administration (TSA) Recapitalization and Baggage Handling System (BHS) Modernization project at Denver International Airport (DEN). After the events of 9/11/2001, Congress mandated that all passenger bags be screened for explosives prior to being put on a plane. As part of that effort, the TSA provided bag screening equipment, which it owns. As part of a national program to keep this screening equipment technologically current, TSA has determined that the equipment presently at DEN has reached the end of its useful life and needs to be replaced. The new machines provided by TSA process bags at a significantly faster rate than the existing and therefore, fewer replacement machines will be provided. The differences in bag processing rates and number of machines needed require that DEN modify the baggage system to accommodate the conveyor configurations, speeds, and controls interface necessary for the new machines to operate efficiently and effectively. In addition, but separate from the TSA-funded recapitalization work, optional work will be included in the RFP and contract for work in and on the baggage system. DEN has applied for FAA grant funding for the optional work. If FAA grant funding is obtained or DEN desires to fully fund the optional work itself, the work will be assigned to the selected contractor. Given the timing available for the FAA grants and that the optional work will be in the same system and physical location as recapitalization work, it is more time and cost efficient to procure this work with the recapitalization work and have one contractor do all of this baggage work. Participation Requirements - Disadvantaged Business Enterprise (DBE) General Requirements - Insurance Required - Bidder Prequalification/Preregistration Required - Contractors License Required - Prevailing Wage Required - License Required - Employee Background Checks Required - Certification/Training - Federally Funded - Safety Standards Plan - Security Badges Bonding Requirements - Performance Bond 100000 $ - Payment Bond 100000 $ Question Acceptance Deadline 05/05/2022 04:00 PM EDT Questions are submitted online Yes

Details

Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents