Similar Projects
Towson Avenue - Garrison to Zero Street - City of Fort Smith
Infrastructure
Conception
$2,000,000 CJ est. value
Fort Smith, AR 72901

Concrete Pad
Infrastructure
Design
$250,000 CJ est. value
Fort Smith, AR 72903

2016 Sanitary Sewer Assesment (SSA) Remedial S007 (Construction) - City of Fort Smith
Infrastructure
Design
$6,000,000 CJ est. value
Fort Smith, AR 72904

RFQ Engineering - Garrison Avenue Complete Street and Towson Avenue Corridor Plan
Infrastructure
Post-Bid
$450,000 CJ est. value
Fort Smith, AR 72901

Construct Covered Walkway
Infrastructure
Post-Bid
$100,000 CJ est. value
Fort Smith, AR 72903

2022 Drainage Improvement, Carol Ann Cross Park
Infrastructure
Results
$320,000 est. value
Fort Smith, AR 72903

Construction of Deep Patch Repairs, Culvert Replacements and Overlay of Norwood Drive
Infrastructure
Results
$366,000 est. value
Greenwood, AR 72936

Construction Services to Build Two (2) Single-family Transitional Homes
New Construction, Infrastructure
Construction
$700,000 CJ est. value
Fort Smith, AR 72901

Wells Lake Cottages
New Construction, Infrastructure
Pending Verification
$21,000,000 CJ est. value
Fort Smith, AR 72904

66th Street Duplex
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Fort Smith, AR 72903

2017 Basin Z001 Remedial Measures (Design and Construction) - City of Fort Smith / Arkansas Department of Transportation
Infrastructure
Design
$6,112,000 CJ est. value
Fort Smith, AR 72904

Barling Park Water Line Extension for Splash Pad and Fire Hydrant
Infrastructure
Post-Bid
$404,000 CJ est. value
Barling, AR 72923

Emergency Management and Public Safety Facility Parking Lot Improvements
Infrastructure
Results
$132,865 CJ est. value
Fort Smith, AR 72903

2016 Sanitary Sewer Assesment (SSA) Remedial P008 (Construction) - City of Fort Smith
Infrastructure
Pending Verification
$13,500,000 CJ est. value
Fort Smith, AR 72904

Kimmons Cafeteria Expansion Bid Packages - 1 to 28
Addition, Demolition, Infrastructure
Post-Bid
$5,264,283 CJ est. value
Fort Smith, AR 72904

Last Updated 01/11/2023 10:39 AM
Project Title

May Branch Outfall Culvert Remediation

Physical Address View project details and contacts
City, State (County) Fort Smith, AR 72904   (Sebastian County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $6,100,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the demolition and removal of 258 linear feet of existing 12' x 10' precast concrete culvert and its replacement with 258 linear feet of 12' x 10' $100.00 Hawkins-Weir Engineers, Inc. Hawkins-Weir Engineers, Inc. cast-in-place concrete box culvert along North P Street near its intersection with Riverfront $1,000 per day beyond Final Completion Date Drive. Installation of the replacement box culvert will require the use of shoring, well points, and installation of driven H-piles in the subgrade. Bypass pumping of stormwater in the May City of Fort Smith, Arkansas Branch storm drain outfall and separate bypass pumping of plant effluent from the P Street Water Reclamation Facility will be required through some or all of the construction period. The project will also include subsurface injection of grout to address ground subsidence along approximately 970 linear feet of proposed and existing box culvert trench line immediately upstream of the P Street Pump Station. May Branch Outfall Culvert Remediation- Revise the first sentence to read "This item shall consist of a foundation course for surface course, for other base courses, for pavements, or as a stand-alone aggregate base course driveway The Owner reserves the right to waive any informalities or to reject any or all bids. Each bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the Section 102 of the Standard Specifications. All bidders must be licensed under the terms of Act 150 of the 1965 Acts of the Arkansas Legislature, including subsequent amendments. No bidder may withdraw his bid within 60 days after the actual date of the opening hereof. The City of Fort Smith is an EOE M/F. Completion- 360 consecutive calendar days

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents