Similar Projects
SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$610,000 CJ est. value
Martinsville, OH 45146

SR 134 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$610,000 CJ est. value
Martinsville, OH 45146

Ashland County Guardrail Installation and Upgrade Project 2023
Infrastructure
Bidding
$400,000 CJ est. value
Ashland, OH 44805

Ashland County Guardrail Installation and Upgrade Project 2023
Infrastructure
Bidding
$400,000 CJ est. value
Ashland, OH 44805

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Township Road 754 Paving
Infrastructure
Post-Bid
OH

Chip Seal- D10-Chip Seal FY2022 North
Infrastructure
Results

Ashland High School Stadium Track Surface Replacement Project
Alteration
Results
$368,500 est. value
Ashland, OH 44805

D03 FY2021 (B) Bridge Repair
Infrastructure, Renovation
Design
$715,000 CJ est. value
Ashland, OH 44805

Road Materials
Alteration
Post-Bid
Loudonville, OH

Chip Seal - D04-CHIP FY2022
Infrastructure
Results
$1,225,000 est. value

SR 302 - Bridge Preservation
Infrastructure, Renovation
Design
$2,805,000 CJ est. value
Ashland, OH 44805

Road Oil
Infrastructure
Post-Bid
Perry, OH

Intersection - ASD-US 250-19.88
Infrastructure
Results
$1,259,785 est. value
OH

Bus Parking Lot - Black River Local School District
Renovation
Design
$500,000 CJ est. value
Sullivan, OH 44880

Last Updated 01/30/2023 01:33 AM
Project Title

Roadway Major Rehab - US 545

Physical Address View project details and contacts
City, State (County) Ashland, OH 44805   (Ashland County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected July 2025
Bids Due View project details and contacts
Estimated Value $12,350,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Major Rehab Funded ProjectFDR w 2 ft Widening both sides of pavementASD SR 545 00.00 - 05.46 As of January 30, 2023, the project is in Design status. Anticipated letting date is January 01, 2025. OHDOT - Roadway Major Rehab - US 545 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents