Similar Projects
Osseo - Neillsville Construction / CIR / Resurface
Infrastructure
Conception
$6,000,000 CJ est. value
Neillsville, WI 54456

Osseo - Neillsville Construction / CIR / Resurface
Infrastructure
Conception
$6,000,000 CJ est. value
Neillsville, WI 54456

USH 10 at River Avenue Intersection
Infrastructure
Bidding
$610,153 CJ est. value
Pine Valley, WI 54456

USH 10 at River Avenue Intersection
Infrastructure
Bidding
$610,153 CJ est. value
Pine Valley, WI 54456

Asphalt Bids
Infrastructure
Post-Bid
$400,000 est. value
Chili, WI 54420

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Withee Business Park 2021 Utility Improvements
Infrastructure
Results
Withee, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Marshfield - Abbotsford Constr / Resurface
Infrastructure
Conception
$3,000,000 CJ est. value
Abbotsford, WI 54405

Crack Filling and Chip Sealing
Infrastructure
Bidding
$50,000 CJ est. value
Colby, WI 54421

Concrete Repair and/or Replacement at the Black River View Apartments
Infrastructure, Renovation
Post-Bid
$25,000 CJ est. value
Greenwood, WI 54437

2021 Street and Utility Improvements
Infrastructure
Results
Dorchester, WI

Concession Stand and Press Box
New Construction, Infrastructure
Post-Bid
$542,241 CJ est. value
Abbotsford, WI 54405

Last Updated 04/24/2023 07:30 PM
Project Title

Pulverizing and Resurfacing With 4mt 5828s Hot Mix Asphalt

Physical Address View project details and contacts
City, State (County) Colby, WI 54421   (Clark County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $78,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of 04/24/2023 This project will be completed by the end of 2023. CITY OF COLBY Advertisement for Bids The City of Colby is seeking bids for the pulverizing and resurfacing with 4MT 5828S hot mix asphalt. The job will include pulverizing the existing pavement for base course, hauling the pulverized extra material to the city's dump site, shaping and fine grading, watering and compact base course materials. Paving material will meet Wis DOT specifications for Type 4MT 5828S hot mix asphalt, compacted to a thickness of 4 inches on Hodd Drive (364' x 40' x 4" & 268' x 20' x 4") and 3 inches on E. Lincoln Street two lifts (118' x 36' x 3"). This work will be completed by September 1, 2023. . The City of Colby reserves the right to accept or reject any and all bids. Call Harland Higley at 715-223-2586 with any questions. 133485 W

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents