Similar Projects
Columbia Cosmopolitan Recreation Area Playground Replacement
Renovation
Bidding
$55,000 est. value
Columbia, MO 65202

Concrete Pavement Repair
Infrastructure
Bidding
$1,000,000 to $2,500,000 est. value
Kansas City, MO

BS Park Post Tension Concrete Basketball Court
Post-Bid
Blue Springs, MO

Hay Ground on Little Otter Creek
Renovation
Post-Bid
Kingston, MO

Intersection Improvements
Results
Gladstone, MO 64119

Sunridge Park Asphalt and Sealing Project 2021
Results
Hillsboro, MO 63050

ADA, Pavement and Signing Improvements
Infrastructure
Bidding
$10,000,000 to $15,000,000 est. value
Kirkwood, MO 63122

Excelsior Springs High School Baseball Field
New Construction
Post-Bid
Excelsior Springs, MO 64024

2021 Intermediate Maintenance Program
Results
Gladstone, MO

Gregory Boulevard Streetscape - Wornall to Oak
Infrastructure
Bidding
$200,000 est. value
Kansas City, MO 64132

Level and Gravel Fill
New Construction
Post-Bid
California, MO

Asphalt Paving Repair
Results
Saint Louis, MO

Asphaltic Overlay - Kirkwood Park
Infrastructure
Bidding
$500,000 est. value
Kirkwood, MO 63122

Repair Gravel Roadways - Disaster 4451
Infrastructure
Post-Bid
Less than $323,868 est. value
Craig, MO

Kirkwood School District Paving Maintenance Projects 2021
Term Contract
Results
Kirkwood, Saint Louis, MO 63122

Reported 05/04/2022 12:00 AM
Project Title

C-2 School District Paving and Playground Project - Phase 1 and 2

Physical Address View project details and contacts
City, State (County) Hardin, MO   (Ray County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $1,350,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of two Phases: 1. Phase one Parking Lot Paving, Lighting, & Awning in front of the School Building. a. Project cost range is anticipated to be approximately $550,000. 2. Phase two Playground remodel in the rear of the School Building. a. Project cost range is anticipated to be $800,000.

Details

Park/Playground, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents