Similar Projects
Franklin Street Service Main Replacement - City of Auburn
Infrastructure
Conception
$660,000 CJ est. value
Auburn, NY 13021

Franklin Street Service Main Replacement - City of Auburn
Infrastructure
Conception
$660,000 CJ est. value
Auburn, NY 13021

Intersection Widening Project
Infrastructure
Design
$1,399,000 CJ est. value
Auburn, NY 13021

Multi-Site Enhancements Project
Infrastructure
Bidding
$4,561,833 CJ est. value
Auburn, NY 13021

Union Springs CSD - 2022 CIP
Renovation, Infrastructure
Bidding
$500,000 CJ est. value
Union Springs, NY 13160

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Port Byron CSD 2021-2022 Capital Outlay Project
Infrastructure, Alteration
Post-Bid
Port Byron, NY 13140

Town of Sennett Water District No. 3
Infrastructure
Results
$5,218,411 CJ est. value
Sennett, NY 13021

Town of Sennett Water District No. 3
Infrastructure
Results
$5,218,411 CJ est. value
Sennett, NY 13021

Radiation Treatment Center at Auburn Community Hospital
New Construction, Infrastructure - 12,000 SF
Pending Verification
$14,400,000 CJ est. value
Auburn, NY 13021

Cayuga Watercourse - New York Power Authority (NYPA)
Infrastructure
Pending Verification
$15,000,000 CJ est. value
Cayuga, NY 13034

Lake Avenue Pavement Preservation Project - City of Auburn
Infrastructure
Conception
$3,638,000 CJ est. value
Auburn, NY 13021

Removal of Sediment From North Brook
Infrastructure
Post-Bid
$125,000 CJ est. value
Weedsport, NY 13166

Sunrise Ag, LLC- Bunk Silo Relocation, Leachate Collection System and Access Road
Infrastructure
Results
$414,395 CJ est. value
Owasco, NY 13021

Hillside Children's Center Residential Treatment Renovation
Renovation, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Auburn, NY 13021

Last Updated 05/02/2023 08:01 AM
Project Title

Replace the Waterline at the Port Byron Service Area at Milepost

Physical Address View project details and contacts
City, State (County) Scipio Center, NY 13147   (Cayuga County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected November 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

CR Number: 2096100 Replace the Waterline at the Port Byron Service Area at Milepost 310.2 EB in Cayuga County in accordance with the Plans and Specifications. The Thruway Authority continues to have public bid openings, however, there are measures in place to protect the safety and health of employees and visitors alike. Visitors who choose to hand deliver a bid and/or witness the bid opening are limited to one person. Visitors must wear a face mask when entering any Authority building and will have to complete a Wellness Survey the day of the bid opening. The Wellness Survey will be available in the lobby of the Thruway Authority Headquarters building. Please fill out this survey and provide it to the guard at the front desk. If any of the questions are answered "Yes", the visitor will not be allowed entry. Any bids sent or delivered to an address or location other than the one specified above, or received after this time, will not be accepted. Your bid must be secured with either a Bid Bond or a Bid Deposit. A Bid Bond must be in the amount of 5% of the total bid and must be on the Authority's Bid Bond Form (TA-44117) which is included in the Proposal. A Bid Deposit must be a certified check or cashier's check made payable to the New York State Thruway Authority in the amount of $10,000.00. The New York State Thruway Authority has discontinued the practice of reproducing and furnishing full-size and half-size plans to Contractors after contract award. Contractors shall be responsible for their own hard copies of plans and proposals at no additional cost to the Authority. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 10% Women Owned Sub-Contracting Goal: 10% Service-Disabled Veteran-Owned Business Contracting Goal: 4% Contract term: 03/08/2023 * Project Cancelled*

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents