Similar Projects
Last Updated | 04/27/2021 05:34 AM |
Project Title | 1000-1500 Blocks of East Maple Avenue Pavement Replacement |
Physical Address | View project details and contacts |
City, State (County) | Eagle City, Enid, OK (Blaine, Garfield Counties) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 107.00 LF 22 15" R.C. PIPE CLASS III 91.00 LF 23 18" R.C. PIPE CLASS III 141.00 LF 24 24" R.C. PIPE CLASS III 53.00 LF 25 30" R.C. PIPE CLASS III 928.00 LF 26 VALVE BOXES ADJUST TO GRADE 5.00 EA 27 METER BOXES ADJUST TO GRADE 5.00 EA 28 REMOVAL OF CONCRETE PAVEMENT 20.00 SY 29 REMOVAL OF CONCRETE PAVEMENT W/ ASPHALT OVERLAY 1,607.00 SY 30 REMOVAL OF CONCRETE DRIVEWAY 173.00 SY 31 REMOVAL OF CURB AND GUTTER 432.00 LF 32 REMOVAL OF SIDEWALK 726.00 SY 33 SAWING PAVEMENT 216.00 LF 34 SHEET ALUMINUM SIGNS 81.00 SF 35 2" SQUARE TUBE POST LF 126.00 Total BASE BID Calendar Days to Complete Work 1 MOBILIZATION 1.00 LSUM 2 BONDS AND INSURANCE 1.00 LSUM 3 CONSTRUCTION STAKING LEVEL I 1.00 LSUM 4 CONSTRUCTION TRAFFIC CONTROL 1.00 LSUM 5 CLEARING AND GRUBBING 1.00 LSUM 6 UNCLASSIFIED EXCAVATION 2,476.00 CY 7 UNCLASSIFIED BORROW 50.00 CY 8 TYPE A-SALVAGED TOPSOIL 1.00 LSUM 9 TEMPORARY EROSION AND SEDIMENT CONTROL 1.00 LSUM 10 8" STABILIZED SUBGRADE 4,954.75 SY 11 DOWEL JOINTED P.C. CONCRETE PAVEMENT (PLACEMENT) 4,721.98 SY 12 P.C. CONCRETE FOR PAVEMENT 902.83 CY 13 2'-8" COMB. CURB & GUTTER (6" BARRIER) 2,515.00 LF 14 4" CONCRETE SIDEWALK 568.10 SY 15 6" CONCRETE DRIVEWAY 739.47 SY 16 INLET CI DES. 1 (STD) 2.00 EA 17 INLET CI DES. 1 - B 4.00 EA 18 INLET CI DES. 2 (STD) 4.00 EA 19 12" R.C. PIPE CLASS III 69.00 LF 20 15" R.C. PIPE CLASS III 291.00 LF 21 18" R.C. PIPE CLASS III 280.00 LF 22 24" R.C. PIPE CLASS III 525.00 LF 23 30" R.C. PIPE CLASS III 44.00 LF 24 4' DIA. MANHOLE 8.00 EA 25 VALVE BOXES ADJUST TO GRADE 5.00 EA 26 METER BOXES ADJUST TO GRADE 5.00 EA 27 REMOVAL OF CONCRETE PAVEMENT 14.00 SY 28 REMOVAL OF CONCRETE PAVEMENT W/ ASPHALT OVERLAY 1,071.00 SY 29 REMOVAL OF CONCRETE DRIVEWAY 116.00 SY 30 REMOVAL OF CURB AND GUTTER 288.00 LF 31 REMOVAL OF SIDEWALK 484.00 SY 32 SAWING PAVEMENT 440.00 LF 33 SHEET ALUMINUM SIGNS 0.00 SF 34 2" SQUARE TUBE POST 0.00 LF Total LOCATION 1 Calendar Days to Complete Work 1000 - 1500 BLKS OF E. MAPLE AVE., R-2110C |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |