Similar Projects
Boiler Plant Upgrades
Renovation, Alteration
Design
$100,000 to $250,000 est. value
Bath, NY 14810

Boiler Plant Upgrades
Renovation, Alteration
Design
$100,000 to $250,000 est. value
Bath, NY 14810

HVAC Systems and Associated Ductwork Services & Inspections
Term Contract
Bidding
New York, NY

Kaye Playhouse Rooftop AHU Replacement and Asbestos Abatement
Alteration
Bidding
New York, NY

HVAC Testing and Balance - Districtwide
Term Contract
Post-Bid
White Plains, NY 10605

Water Treatment Service - Cooling Towers and Boilers
Term Contract
Post-Bid
Middletown, NY 10940

Campus Center AC-2 Upgrade
Results
Albany, NY

Removal and Replacement of Fire, Flood, and H2S Systems
Results
$100,000 to $250,000 est. value
Dresden, NY 14441

J065--Boiler Inspection Maintenance
Term Contract
Bidding
Jamaica, NY 11209

Propane Fired Furnace
Post-Bid
Bloomingdale, NY 12913

Rehabilitate Hot Water Heating System Walters Hall
Results
Syracuse, NY 13210

Maintenance of HVAC at JTS Center
Term Contract
Bidding
Hillburn, NY 10931

Clean & Tunes of Gas and Oil-Fired Furnaces, and Gas and Oil-Fired Water and Steam Boilers
Term Contract
Post-Bid
NY 12401

Ellenville Middle / High School HVAC Improvements
Results
Ellenville, NY 12428

Air Compressor Maintenance / Grand Central Terminal
Alteration
Bidding
New York, NY

Last Updated 09/27/2021 03:10 AM
Project Title

Department of Public Works HVAC and Boiler Replacement Project

Physical Address View project details and contacts
City, State (County) Auburn, NY 13021   (Cayuga County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The successful Contractor shall provide all equipment, materials, labor and incidentals to perform the following work: Disassemble, remove and dispose of existing Weil McLain boiler along with 2.5” air separator and burner assembly. Disassemble, remove and dispose of limited supply and return piping, natural gas piping, and flue vent piping along with any other demolition necessary to complete the project. Flush system thoroughly. Furnish and install (1) High efficiency Navien Boiler NFB-200 (or comparable) to replace the existing Weil McLain unit along with supply and return piping, natural gas piping, outside air vent piping for combustion air intake using existing chimney , boiler flue vent piping, isolation ball valves, and hydraulic separator with magnet for contaminate removal. Furnish and install new pipe insulation for all piping installed under the project. Furnish and install (1) five ton Samsung DVM S ECOVRF heat pump system (or comparable), (3) 12,000 BTU wall mount Samsung Windfree 2.0 wall units (or comparable) along with necessary refrigerant line sets and Y branches for each unit, and (3) 9,000 BTU wallmount Samsung Windfree 2.0 wall units (or comparable) along with necessary refrigerant line sets and Y branches for each unit.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Heating Boilers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents