Similar Projects
Stairwell Pressurization MEP
Alteration
Bidding
$987,000 est. value
Madison, WI 53706

Stairwell Pressurization GPC
Alteration
Bidding
$987,000 est. value
Madison, WI 53706

MEPF Design Assist for East, West and Capital High Schools
Alteration
Sub-Bidding
Madison, WI 53704

Vendor Service Contract for Essential/Emergency HVAC Services
Term Contract
Post-Bid
Milwaukee, WI 53202

Ionization System Installation
Post-Bid
Lancaster, WI 53813

Kitchen Hood Replacement - MEP
Results
Less than $674,000 est. value
Menomonie, WI 54751

Kitchen Hood Replacement - General
Results
Less than $674,000 est. value
Menomonie, WI 54751

HVAC, Hot Water Heaters & Refrigerators
Term Contract
Post-Bid

Training Kitchen Fire Suppression and Exhaust Replacement
Results
Less than $232,000 est. value
Oshkosh, WI 54901

Emergency Furnace Replacements
Term Contract
Post-Bid
Wisconsin Dells, WI 53965

Liebert Air Conditioning Unit for Sheriff's Office Communications
Results
Elkhorn, WI 53121

HVAC Hot Water Heaters and Refrigerators Installment
Term Contract
Post-Bid

WITC - Rice Lake Campus Heat Pumps
Results
Rice Lake, WI 54868

Emergency Furnace Replacement
Term Contract
Post-Bid

Northeast Wisconsin Technical College Fan Wall Upgrade
Results
Green Bay, WI 54303

Last Updated 07/17/2021 01:01 AM
Project Title

Buildings N, P and C Air Tempering - GPC

Physical Address View project details and contacts
City, State (County) Mauston, WI 53948   (Juneau County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,275,400
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of the installation of rooftop DX condensing units and necessary structural supports on individual buildings and the installation of DX cooling coils within the existing air handling units serving Buildings “N”, “P”, and the gym of “C”. The existing electrical power supply will be modified to provide power to the new DX condensing units. All new equipment to be controlled by a direct digital control (DDC) system. Each of the modified air handling system will be converted from constant volume to a variable air volume (VAV) type system, with a VAV damper terminal installed at each existing reheat coil, replacement of the existing variable frequency drives, and updated temperature controls.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents