Similar Projects
Flooring Installation at Kiley Middle School
Post-Bid
$40,000 est. value
Springfield, MA

Classroom Flooring
Post-Bid
Hanover, MA

Hemenway Hall Flooring Upgrades
Results
Less than $190,000 est. value
Framingham, MA 01701

Authority Wide Terrazzo Repairs Term Contract
Term Contract
Results
Less than $150,000 est. value
Boston, MA

BCEC Carpet Replacement
Post-Bid
Less than $2,100,000 est. value
Boston, MA

Sawyer Towers Flooring Replacement
Results
$200,000 est. value
Quincy, MA

Flooring Services/WPS
Term Contract
Post-Bid
Worcester, MA

Epoxy Flooring
Results
$10,000 to $25,000 est. value
Hathorne, MA

2020 On-Call Flooring and Asphalt Repairs
Term Contract
Post-Bid
$25,000 to $50,000 est. value
Fall River, MA

Campus-Flooring Covering
Results
Less than $750,000 est. value
Hadley, MA

Gym Floor Installation - Greendale Head Start Center/WPS
Post-Bid
Worcester, MA 01608

Existing Carpet and the Installation of New Carpet
Results
Less than $35,000 est. value
Erving, MA

Classroom Flooring in 21 Rooms
Post-Bid
Less than $65,000 est. value
Hanover, MA

On-Call Carpet Installation at Various town Buildings and Schools
Results
Less than $125,000 est. value
Reading, MA

Mass Maritime - Company 1-6 Finish Upgrades (Zero Deck)
Post-Bid
Less than $600,000 est. value
Bourne, MA

Reported 05/22/2020 12:00 AM
Project Title

Yarmouth Fire Department Floor Resurfacing Project

Physical Address View project details and contacts
City, State (County) South Yarmouth, MA 02664   (Barnstable County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $48,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Procure the resurfacing a 2000 square foot floor at Yarmouth Fire Department HQ building. The Contractor is responsible for the following: 1. The existing epoxy floor coating will have to be removed if not compatible with the new floor sealer. 2. The new floor sealer must be watertight as there is a basement gym underneath this area. 3. Yellow backup guidelines must be painted. 4. Furnishing, delivering, and storing all materials at the site.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents