Similar Projects
Cronus Chemicals Fertilizer Plant
LEED Certification, New Construction, Infrastructure
Design
$1,762,000,000 CJ est. value
Tuscola, IL 61953

Furnish and Spread Bituminous Materials class A1
Infrastructure
Bidding
$2,000,000 CJ est. value
Tuscola, IL 61953

Furnish and Spread Bituminous Materials class A1
Infrastructure
Bidding
$2,000,000 CJ est. value
Tuscola, IL 61953

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Class A Pavement Patching in East Field Area for a Total Length of 30.54 MI
Infrastructure
Results

8.257 Miles of Smart Resurfacing from ECL of Arthur to US 45
Infrastructure
Results
Arcola, IL

Exterior Concrete Demo and Replacement: Douglas County Courthouse
Renovation, Infrastructure
Construction
$232,590 CJ est. value
Tuscola, IL 61953

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

CM Shoulder Repair from Vine St in Arthur to CR 100 E of Arthur
Infrastructure
Results
IL

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

2021 General Maintenance
Infrastructure
Results
Tuscola, IL

RFQ - Various Phase III Construction Inspection Projects, Various Routes, Various Counties
Term Contract
Post-Bid
Schaumburg, IL 60194

Tuscola Downtown Alley Improvements Phase 1
Infrastructure
Results
$635,255 CJ est. value
Tuscola, IL 61953

RFQ - Various Phase II Traffic Signal Coordination and Timing (SCAT) Projects, Various Routes
Term Contract
Post-Bid
$300,000 CJ est. value
Springfield, IL 62703

Last Updated 07/07/2023 05:07 PM
Project Title

Resurfacing Main Street

Physical Address View project details and contacts
City, State (County) Atwood, IL 61913   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $421,150 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

City/County - Atwood Resurfacing Main Street from the north side of the Railroad Right-of-Way to the intersection of Forest Avenue, approximately 610. Included in this work is: hot-mix asphalt surface removal, variable depth, PCC patching, clean and tack coat, 2 hot-mix asphalt resurfacing, sidewalk removal/replacement, combination concrete curb and gutter removal/replacement, construction of commercial entrance, sidewalk ramps and all necessary incidental work needed to complete the roadway improvements. Project Location: Main Street - 610 (0.12 mi) Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Resurfacing Main Street - 23-00000-00-GM

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents