Similar Projects
Resurfacing and Related Work on a Section of Interstate 495
Bidding
Less than $2,533,127 est. value
Middleborough, MA 02344

Fiber Reinforced Crack Sealing
Bidding
Brockton, MA

Intersection Improvements at Liberty Street and County Road
Post-Bid
$570,000 est. value
Hanson, MA

Statewide Airport Pavement Maintenance and Pavement Project at Various Airports
Post-Bid
Less than $1,000,000 est. value

2018 Pavement Rehabilitation Contract Nantasket Avenue - H Street to Y Street
Results
$900,000 est. value
Hull, MA

Drainage and Roadway Improvements along Winter Street between Pine Street and Duxbury Town Line
Results
$560,000 est. value
Kingston, MA

ELM Street Reconstruction
Post-Bid
Less than $5,500,000 est. value
Bridgewater, MA

Resurfacing, Pavement Repairs and Related Work at Various Locations
Results
Less than $1,778,300 est. value

Crack Sealing
Post-Bid
Halifax, MA

Roadway Reconstruction and Related Work (Including Signals) along a Section of Route 6 and 28 (Cranberry Highway).
Results
Less than $16,160,914 est. value
Wareham, MA

Hot in Place
Post-Bid
Halifax, MA

Resurfacing and Related Work (Including 3 Bridges) along a Section of Route 44.
Results
Less than $7,072,764 est. value
Middleborough, MA

Microsurfacing
Post-Bid
Halifax, MA

Scheduled and Emergency Roadway Repairs at Various Locations
Results
Less than $236,825 est. value

In-Place Bituminous Concrete
Term Contract
Post-Bid
Halifax, MA

Last Updated 01/24/2019 05:25 AM
Project Title

Resurfacing and Related Work (Including 7 Bridges) along Sections of Route 3 (Pilgrims Highway)

Physical Address View project details and contacts
City, State (County) Hanover, Hingham, Norwell, Pembroke, Rockland, MA   (Plymouth County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $12,553,935
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description "1.000","Ls","Schedule Of Operations - Fixed Price $82500","100." "90000.000","Sy","Selective Clearing And Thinning For Roadside Clearance","102.02" "50.000","Ea","Tree Removed (Excluding Stump) Diameter Under 24 Inches","105.40" "30.000","Ea","Tree Removed (Excluding Stump) Diameter 24 Inches And Over","105.43" "5.000","Cy","Reinforced Concrete Excavation","127.1" "320.000","Sy","Reinforced Concrete Deck Excavation (Full Depth)","127.4" "14.000","Cy","Reinforced Concrete Deck Excavation (Partial Depth)","127.41" "60.000","Cy","Reinforced Concrete Deck Excavation At Joints","127.42" "195.000","Sy","Bridge Pavement Excavation","129.6" "3.000","Ton","Disposal Of Treated Wood Products","184.1" "300.000","Ea","Drainage Structure Adjusted","220." "125.000","Ft","Drainage Structure Rebuilt","220.2" "6.000","Ea","Drainage Structure Remodeled","220.5" "20.000","Ea","Frame And Cover - Secured","221.1" "325.000","Ea","Frame And Grate - Massdot Bar Type","222." "345.000","Ea","Frame And Grate (Or Cover) Removed And Discarded","223.2" "450.000","Cy","Removal Of Drainage Structure Sediment","227.3" "3500.000","Ft","Removal Of Drainage Pipe Sediment","227.31" "4200.000","Ft","Pavement Milling Mulch For Shoulders","402.13" "420000.000","Sy","Pavement Micromilling","415." "4700.000","Sy","Bridge Pavement Micromilling","415.1" "48000.000","Ton","Hma Gap Graded Asphalt Rubber (Hma Argg)","450.8" "49490.000","Ton","Contractor Quality Control","450.90" "1000.000","Ton","Hma For Patching","451." "30000.000","Gal","Asphalt Emulsion For Tack Coat","452." "1800.000","Ft","Hma Joint Sealant","453." "435.000","Ton","Superpave Waterproofing Surface Course (Ssc-w-9.5)","457.1" "20.000","Ton","Hot Mix Asphalt Berm, Type a","470." "35.000","Ton","Hot Mix Asphalt For Miscellaneous Work","472." "180000.000","Ft","Milled Rumble Strip","477." "1100.000","Ft","Sawing & Sealing Joints In Asphalt Pavement At Bridges","482.31" "800.000","Ft","Granite Edging Type Sb - Straight","511.1" "800.000","Ft","Edging Removed And Discarded","597." "55000.000","Ft","Guardrail, Tl-3 (Single Faced)","620.13" "1500.000","Ft","Steel Thrie Beam Bridge Rail Retrofit","626.32" "34.000","Ea","Trailing Anchorage","627.1" "35.000","Ea","Guardrail Tangent End Treatment, Tl-3","627.83" "2.000","Ea","Transition To Rigid Barrier (Single Faced)","628.22" "12.000","Ea","Transition To Bridge Rail","628.24" "8.000","Ea","Transition To Thrie Beam","628.25" "57150.000","Ft","Highway Guard Removed And Discarded","630.2" "25.000","Ea","Guardrail Post - Steel","632." "350.000","Ea","Guardrail Post - Wood","632.1" "350.000","Ea","Guardrail Offset Block - Thrie Beam","633.1" "180.000","Ea","Thrie Beam Guard Panel","634.1" "30.000","Mo","Engineers Field Office And Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "5000.000","Ft","Compost Filter Tubes","767.12" "57200.000","Ft","Pavement Milling Mulch Under Guard Rail","769." "8.000","Ea","Cedar - Red 5-6 Feet","772.336" "8.000","Ea","Maple - Red - 'Red Sunset' 2-2.5 Inch Caliper","776.557" "8.000","Ea","Oak - Pin 2-2.5 Inch Caliper","777.138" "35.000","Ea","Demountable Reflectorized Delineator - Guard Rail","833.5" "73.000","Ea","Delineation For Guard Rail Termini","833.7" "300.000","Day","Traffic Cones For Traffic Management","851.1" "775.000","Sf","Safety Signing For Traffic Management","852." "750.000","Ft","Temporary Barrier Removed And Reset","853.21" "750.000","Ft","Temporary Barrier (Tl-3)","853.23" "600.000","Day","Truck Mounted Attenuator","853.403" "1.000","Ea","Temporary Impact Attenuator Removed And Reset","853.501" "1.000","Ea","Temporary Impact Attenuator Unidirectional, Redirective (Tl-3)","853.63" "275.000","Day","Temporary Illumination For Work Zone","853.8" "228000.000","Ft","Temporary Paving Markings - 6 Inch (Painted)","854.016" "30000.000","Ft","Temporary Paving Markings - 6 Inch (Tape)","854.036" "600.000","Day","Arrow Board","856." "600.000","Day","Portable Changeable Message Sign","856.12" "48000.000","Day","Reflectorized Drum","859." "3000.000","Day","Reflectorized Drums With Sequential Flashing Warning Lights","859.1" "300.000","Sf","Pavement Arrows And Legends Refl. White (Thermoplastic)","864.04" "400.000","Ea","Slotted Pavement Marker Two-Way White/Red","864.33" "215.000","Ea","Slotted Pavement Marker Two-Way Yellow/Red","864.34" "124000.000","Ft","6 Inch Wet Reflective Recessed White Line (Polyurea)","868.206" "7600.000","Ft","12 Inch Wet Reflective Recessed White Line (Polyurea)","868.212" "4000.000","Ft","24 Inch Wet Reflective Recessed White Line (Polyurea)","868.224" "2700.000","Ft","4 Inch Durable Wet Reflective Recessed White Line (Preformed)","868.304" "100000.000","Ft","6 Inch Wet Reflective Recessed Yellow Line (Polyurea)","869.206" "5.000","Cy","5000 Psi, 3/4 Inch, 685 Hp Cement Concrete","904.3" "1000.000","Sf","Cementitious Mortar For Patching","909.2" "165.000","Cy","Rapid Setting Low Permeability Deck Repair Concrete","909.3" "19000.000","Lb","Steel Reinforcement For Structures - Epoxy Coated","910.1" "350.000","Sy","Membrane Waterproofing For Bridge Decks","965." "1375.000","Ft","Precompressed Joint Sealer System","973.1" "1000.000","Sf","Existing Protective Shielding Removed And Reset","994.05" "3000.000","Sf","Temporary Protective Shielding","994.1"
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents