Similar Projects
Equipment Operation and Maintenance for The Central Energy Building, Naval Health Clinic, MCAS Cherry Point Nc
Design
Cherry Point, NC

Page Hall Renovation
Renovation, Alteration - 31,000 SF
Design
Raleigh, NC 27695

DPS Burton Elementary School Boiler Replacement
Alteration
Bidding
Durham, NC 27701

Graham A Barden Elementary School HVAC
Alteration
Bidding
New Bern, NC 28562

Manns Harbor Shipyard Main Building HVAC
Post-Bid
Manns Harbor, NC 27953

Needle Point Bipolar Ionizers
Post-Bid
Charlotte, NC

HVAC Repairs Rachel Freeman School of Engineering
Results
Less than $93,657 est. value
Wilmington, NC 28405

Lee County Enrichment Center HVAC Replacement
Results
Sanford, NC

Clearwater Ceramics Center
Alteration
Construction
Concord, NC

Greenhouse/Headhouse Heating and Ventilation Modifications and Repairs
Infrastructure
Design
$100,000 to $250,000 est. value
Raleigh, NC 27606

Jefferson Middle School ERV(Energy Recovery Ventilation) Project
Alteration
Bidding
$200,000 est. value
Winston-Salem, NC 27106

Design-Build for Leland Middle School HVAC Improvements
Post-Bid
Leland, NC 28451

DPS - Morrison Aggrey Dorm Heating System Replacement
Results
Raleigh, NC 27699

Modify Test Cell 1 for PTMS Heat Exchanger B137
Alteration
Bidding
$500,000 to $1,000,000 est. value
Cherry Point, NC 28533

Air Conditioning System Trainer With H-Block
Post-Bid
Greensboro, NC 27407

Reported 05/13/2022 05:37 PM
Project Title

Air Handling Unit UV Light Installations

Physical Address View project details and contacts
City, State (County) Salisbury, NC 27292   (Rowan County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall install UVC systems for all air handling units cooling coils. The purpose is to provide microbial disinfection of air handling components to prevent the spread of viruses, and inhibit the growth of spores and molds on the air handling components. This controls the proliferation of microorganisms in HVAC systems, which reduces maintenance requirements and eliminates odors. Improved coil heat transfer, lower pressure drop across the coil, and reduced air handler speed all will contribute to significant customer long-term energy savings and reduced system maintenance.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents