Similar Projects
South Main Street - Avenida De Mesilla To Boutz - City Of Las Cruces
Infrastructure, Alteration
Conception
$3,300,000 est. value
Las Cruces, NM 88007

Melendres Avenue - Hadley To Picacho - City Of Las Cruces
Infrastructure
Conception
$750,000 est. value
Las Cruces, NM 88005

Plaza del Monte
New Construction, Infrastructure
Design
$13,900,000 CJ est. value
Santa Fe, NM 87501

Taylor Middle School Classroom Block - Albuquerque Public Schools
Addition, Infrastructure
Design
$4,900,000 CJ est. value
Los Ranchos de Albuquerque, NM 87114

AutoZone #4052 / Santa Fe
New Construction, Infrastructure - 6,500 SF
Bidding
$1,500,000 CJ est. value
Santa Fe, NM 87507

RFQ Contractor - El Vado Dam Spillways and Dam Crest Modification Project
Infrastructure
Bidding
$86,000,000 CJ est. value
Tierra Amarilla, NM 87575

RFQ Contractor - Black Mesa Low Water Crossing
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Mentmore, NM 87301

Joan Jones Community Center at Atrisco Hills Addition Phase 2
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$1,500,000 CJ est. value
Albuquerque, NM 87105

3735 Tunnel Repairs Phase VI-B
Renovation
Results
Las Cruces, NM

Underground Concrete Utility Vaults
Results
Less than $50,000 est. value
Farmington, NM

Hiland Plaza
New Construction, Infrastructure - 2,000 SF
Construction
$18,000,000 CJ est. value
Albuquerque, NM 87108

The Heredia Community Ditch Diversion project
New Construction, Infrastructure
Construction
San Lorenzo, NM

Rufina Street Mixed Use Development
New Construction, Infrastructure - 63,191 SF
Pending Verification
$20,000,000 CJ est. value
Santa Fe, NM 87507

Rancho Alegre Feeder Routes - 2020 Bond - Santa Fe County
Infrastructure
Pending Verification
$800,000 CJ est. value
Santa Fe, NM 87508

Pueblo Of Jemez Housing Authority Three Residential Housing Units
New Construction, Infrastructure
Design
$1,013,000 CJ est. value
Jemez Pueblo, NM 87024

Last Updated 08/23/2022 12:32 PM
Project Title

RWW-Lake Maloya Dam Safety Improvements - 15247 - City of Raton

Physical Address View project details and contacts
City, State (County) Raton, NM 87740   (Colfax County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $25,200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitation of outlet works and increase open-channel spillway capacity to meet current requirements This multifaceted project would include environmental studies, hydrological studies, Preliminary Engineering Reports, Design and Construction. These improvements include the evaluation of existing outlet works and subsequent repair and replacement. Study, design, planning, and construction to make the reservoir compliant with current Dam Safety Regulations as adopted by the New Mexico Office of the State Engineer. Process will begin with a preliminary engineering report. Plans and specifications will be developed by engineer and construction shall be procured through a sealed bid process. Scope of Work Phasing Plan: Phase 1 - Complete Outlet Works Investigation and Develop Preliminary Engineering Report for Outlet Piping. Phase 2 - Complete Design and Construction of Outlet Works Rehabilitation. Phase 3 - Complete Preliminary Engineering Report Regarding Spillway Capacity and Dam Safety Issues, Design and Construction of Dam Safety Improvements regarding Spillway Capacity. Phase 4 - Design and construction of Dam Safety Improvements to Spillway. Work completed to date includes site specific hydrology evaluation, a preliminary engineering report for auxiliary spillway capacity issues and an evaluation of the service spillway. As of January 25, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents