Similar Projects
Water Tank Recoating 2019
Post-Bid
Less than $150,000 est. value
Jacksonville, OH

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

0.5 MG Elevated Water Storage Tank
Results
$1,590,000 est. value
Tipp City, OH

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Contract I: Procurement of two hundred (200) Grinder Pump Cores, Controls and Appurtenances
Results
Hillsboro, OH 45133

H--Annual Water Tank Cleaning and Inspection | Base +4 OYs
Results
Chillicothe, OH

Supply and Installation of a 12,000 Gallon Horizontal, Doublewall Tank
Results
Circleville, OH 43113

Dogwood Reservoir Rehabilitation
Results
Less than $388,198 est. value
Dayton, OH 45390

Bowling Green WPC ATAD Tank Cover Replacement
Results
Less than $750,000 est. value
Bowling Green, OH 43402

Brooks Avenue Elevated Water Tank Improvements
Term Contract
Results
Less than $380,000 est. value
Van Wert, OH 45891

WRRF Sludge Tank
Results
Less than $1,800,000 est. value
Wooster, OH 44691

Compost - DEF Tank
Results
Columbus, OH

West Elkton Water Tower Replacement
Results
New Miami, OH 45011

Easterly Aeration Tanks Rehabilitation Project(Atr-4)(1540)
Results
Less than $12,600,000 est. value
Cleveland, OH 44115

Luckey Area Water Tower Aeration and Mixing Improvements Wl 183L (A)(1)
Results
Less than $100,000 est. value
Bowling Green, OH 43402

Last Updated 06/18/2020 09:33 AM
Project Title

Centerville South Tank Rehabilitation

Physical Address View project details and contacts
City, State (County) Kettering, OH   (Montgomery County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,657,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work covered under this Contract shall consist of the complete cleaning and repainting of both the interior and exterior, with containment, of a 2,074,800-gallon steel elevated water tank located at 190 North Johanna Dr in Centerville, Ohio. Additional work items include: furnishing and installation of overflow pipe screened flap gate, ladder safe-climbing devices, column platform railing intermediate rails and toe bars, protective cover for inlet/outlet pipe, and clog-resistant roof vent; seal welding of strut ends, interior stiffeners, and dry column crimped seams; removal of interior container ladder; including other miscellaneous repairs and incidental items such as coordination with the OWNER, first anniversary evaluation, disposal of debris, site restoration, etc.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents