Similar Projects
Wastewater Pump Station Improvements
Design
North Bay Village, FL

Wastewater Pump Station Improvements
Renovation
Bidding
North Bay Village, FL 33141

Clarifiers and HLD (ST-2B)
Renovation
Bidding
$55,087,000 est. value
Miami, FL 33190

West Palm Drive Pump Station and Force Main
New Construction
Post-Bid
Florida City, FL 33034

NW 90th Street Stormwater Lift Station No. 2 and Retention Area
Renovation, Infrastructure
Post-Bid
$1,700,000 est. value
Medley, FL 33166

Comprehensive Everglades Restoration Plan; Biscayne Bay Coastal Wetlands; L-31E Flow-Way; Contract 5A (A Phase I Project): Pump Stations S-703 And S-705; Recreational Sites; Miami-Dade County, Florida
Results
$5,000,000 to $10,000,000 est. value
Miami, FL

Center Island Pump Station
Results
Golden Beach, FL 33160

Sanitary Sewer Pump Station E Rehabilitation
Results
Coral Gables, FL 33133

Little River Terrace
Results
Less than $655,000 est. value
Miami, FL 33150

Pump Station F Renovations
Renovation
Results
Less than $370,000 est. value
Coral Gables, FL 33146

Sanitary Sewer Pump Station Leucadendra 1 Rehabilitation Project
Results
Less than $20,800 est. value
Coral Gables, FL 33156

Sanitary Sewer Pump Station Casuarina 2 Rehabilitation Project
Results
Less than $20,800 est. value
Coral Gables, FL 33143

Comprehensive Everglades Restoration Plan, Biscayne Bay Coastal Wetlands, L-31E Flow-Way, Contract 5C (A Phase I Project): Pump Stations S-710 And S-711; Seepage Canal C-711W; Miami-Dade County, Florida
New Construction
Results
$15,000,000 to $25,000,000 est. value
Miami, FL

Rehabilitation of Pump Station A
Renovation
Results
$1,307,300 est. value
North Miami, FL 33168

Sanitary Pump Station D Rehabilitation Project
Renovation, Infrastructure
Results
$1,000,000 est. value
Miami, FL 33143

Last Updated 02/09/2022 12:18 PM
Project Title

Sanitary Pump Station Journey`s End Upgrade and New Force Main Project

Physical Address View project details and contacts
City, State (County) Coral Gables, FL 33156   (Miami-Dade County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $933,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of but is not necessarily limited to the following: delivering and installing of Contractor furnished materials, structures and equipment for the upgrade of Pump Station Journey’s End; installation of new 4-inch PVC C-900 sewage force main pipe and fittings including cleaning and testing as required; installation of new Owner Furnished (OFE) Submersible Control Panel and associated instrumentation; installation of four 5-inch Florida Power & Light (FPL) Electrical Conduits within the same trench of the proposed force main; restoration of area to preconstruction conditions or better; together with all appurtenant for miscellaneous items and work for a completed project. Based on Project Drawings and Specifications for this project

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 03 - Concrete.
Division 05 - Metals.
Division 09 - Finishes.
Division 11 - Equipment.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents