Similar Projects
Bayou Concrete - Four Points Way / Tallahassee
New Construction, Infrastructure
Conception
Tallahassee, FL 32305

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Welaunee Boulevard Segment 3B Construction Project
Results
Tallahassee, FL 32308

Betton Road Traffic and Pedestrian Enhancement Project and Hickory and Spruce Water Main Improvements
Results
Less than $3,678,098 est. value
Tallahassee, FL 32301

Woodward Avenue Improvements
Infrastructure
Post-Bid
Tallahassee, FL 32304

Richview Road Pass Construction Project
Term Contract
Results
$3,500,000 est. value
Tallahassee, FL 32301

Resurfacing
Results
$6,879,936 est. value
FL

Apalachee Regional Park Entrance and Other Miscellaneous Improvements Project
Results
Less than $900,000 est. value
Tallahassee, FL 32311

Pine Forest Drainage Improvements Project
Results
Tallahassee, FL

Springhill Road Bridge Repair
Renovation
Results
$100,000 est. value
FL

Smith Creek Bike Lane Additions - Phase I and Phase II
Results
Tallahassee, FL 32310

Under Bridge Inspection Unit Rental
New Construction
Results
Tallahassee, FL

Strategic Resource Evaluation Study - Highway Construction Materials
Infrastructure
Results

Old Bainbridge Road Safety Improvements from I-10 to Capital Circle NW
Infrastructure
Results
Tallahassee, FL 32318

Last Updated 07/15/2022 02:48 AM
Project Title

Add Lanes and Reconstruct/Drainage Improvements/Base Work/Bridge Construction/Clearing and Grubbing

Physical Address View project details and contacts
City, State (County) Tallahassee, FL 32318   (Leon County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $64,267,058 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents