Similar Projects
Lakeview Pumping Station - Electrical and Control Improvements - 39131 - City of Chicago
Renovation
Conception
$2,372,566 est. value
Chicago, IL 60640

Lift Station Rehabilitation - Bode Road - Village of Schaumburg
New Construction
Design
$350,000 est. value
Schaumburg, IL 60194

Replacement of Condensate and Sump Pump - Must be Pre-qualified Various Trades Vendors Only
Renovation
Bidding
$70,000 CJ est. value
Chicago, IL 60628

Hicks and Dundee Monopole
Renovation
Post-Bid
Arlington Heights, IL

Menominee Lift Station Rehabilitation
Renovation
Post-Bid
Palos Heights, IL

Dawes Elementary Vacuum Pump Station
Renovation
Results
Chicago, IL 60652

Cottonwood Relief Station Rehabilitation
Results
Mount Prospect, IL

Lagrange Highlands Sanitary District Pump Station Improvements
Renovation
Post-Bid
$236,000 est. value
La Grange, IL 60525

Harlem Avenue Lift Station Improvements
Results
Chicago Ridge, IL 60415

107th Street Pump Station Improvements
New Construction
Results
Chicago Ridge, IL 60415

Terrace Court Stormwater Pump Station Improvements
Renovation
Results
Glencoe, IL

Rehabilitation of Raw Sewage Pump Rotating Assemblies at Various Locations
Renovation
Results
$1,530,000 est. value
Chicago, IL

Tinley Park Post 5 Lift Station Improvements
Renovation
Results
Tinley Park, IL 60487

Lift Station Rehabilitation
New Construction
Results
Arlington Heights, IL

2021 Lift Station Rehabilitation
Renovation
Results
Chicago, IL

Last Updated 07/28/2022 11:04 AM
Project Title

Pump Station 16 Standby Generator and MCC (Motor-Control Center) Replacement

Physical Address View project details and contacts
City, State (County) Arlington Heights, IL 60004   (Cook County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

All Bids were rejected. Project may rebid at a future date. Electronic copies of the Bid Documents in Adobe .pdf format may be obtained for bidding purposes from Burns & McDonnell upon deposit of twenty-five dollars ($25.00) for each set of Contract Documents consisting of one Project Manual and one set of Contract Drawings. All proposals or bids offered must be accompanied by a bid security in the amount of 10% of the total bid in the form of a certified check, bid bond, or cashier's check made payable to the Village of Arlington Heights. No bids shall be considered unless accompanied by such security. Bidders shall comply with the Prevailing Wage Rate Act (820 ILCS 130). Bidders will also be required to comply with the applicable equal employment opportunity provisions. The Village of Arlington Heights reserves the right to reject any and all proposals, to waive informalities in bidding, and to accept the proposal deemed by the Board of Trustees to be the most favorable to the interests of the Village. Bid Documents are available for viewing at the Public Works Facility, 222 N. Ridge Ave., Arlington Heights, Illinois, weekdays 8:00 a.m. to 4:00 p.m.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents